4. The state of play for green infrastructure and nature-based solutions in Italy

GI and NbS are relatively new concepts in the infrastructure field and their transversal nature cuts across geographic areas, sectors, jurisdictions, involving a multitude of actors with different roles and responsibilities. In Italy, GI planning and NbS implementation involves all levels of government as defined by Article 117 of the Italian Constitution, potentially causing some hurdles in their implementation. At the central level, the main administrations involved are the Ministry of Infrastructure and Transport (MIT) and the Ministry of Environment and Energy Security (MASE). They tend to have different roles and responsibilities, but sometimes these might overlap. At the sub-national level, the administrations involved are regions and municipalities, provinces and metropolitan cities, according to the specific functions assigned to them by the normative and regulatory frameworks.

In the absence of a central-level policy and regulatory plan governing GI and NbS, some isolated good practices have been developed at the subnational level (see Box 4.1). However, the existing framework and tools must be strengthened in order to ensure a more widespread and consistent adoption of GI and NbS across the whole national territory.

In the discussions that took place during the fact-finding Mission1, it emerged that the main institutions responsible for infrastructure planning and implementation (i.e. MIT, MASE, and sub-national administrations) adopt slightly different definitions for GI, and reduced co-ordination among them is likely to be an obstacle to the development of a shared approach and knowledge-base. Nonetheless, this is not an uncommon phenomenon. GI is a relatively new concept in spatial planning across the world, and international literature also does not provide an unambiguous definition and interpretation.

For the scope of this report, GI is considered as a planning instrument to ensure that the protection of biodiversity and ecosystem services as well as ecological networks are considered, right from the outset, in territorial and infrastructure development. On the other hand, the term “NbS” refers to specific project-level solutions, including the use of natural materials and the integration of mechanisms that mimic nature in infrastructure projects (e.g. integration of green walls or roofs in buildings, or the use of permeable rather than impermeable pavements to ensure water absorption and retention capacities, therefore mitigating the effects of heavy rains).

To date, Italy has defined a series of national regulations and directives on topics related to green infrastructure, such as protected areas, biodiversity protection and ecosystems, and the Natura 2000 sites2. Moreover, in compliance with the European framework on Biodiversity Protection, Italian Regions integrate green infrastructure in the definition of their Regional Ecological Networks (i.e. Reti Ecologiche Regionali or REN). In certain Regional Territorial Plans (RTPs), RENs are recognized as priority infrastructures, and they represent a key tool to orient spatial planning at the regional and local level.

In 2013, the country approved the law 10/2013 on Norms for the development of green urban spaces, which is the main national legislation on urban green spaces. This law exclusively focuses on the urban level (e.g. the planting of trees and the creation of green spaces in urban spaces)3. Article 3 of Law 10/2013 establishes the creation of the National Committee for the development of public green spaces – coordinated by MASE – which has the mandate to monitor the law’s implementation and promotes compliance by providing guidance to local administrations. The Committee has defined the National Strategy on Urban Green Spaces and a set of Guidelines on the Management of Urban Green Spaces (2017[4]). The Guidelines offer technical, scientific, and cultural criteria and tools for the planning, construction, and management of green spaces in urban and peri-urban contexts. For example, it explains how to carry out a census of green spaces, design local regulations, monitor performance (including costs and benefits) of green elements, as well as what instruments to use when planning for urban green spaces. In addition to that, the 2018 Strategy supports local administrations providing a series of technical criteria and guidelines on urban and peri-urban forestry policies. In particular, the Strategy highlights the need to engage the different stakeholders, including local communities, and adopt a multidisciplinary approach (Alleanza Italiana per lo Sviluppo Sostenbile (ASviS), 2022[5]).

In Italy, environmental and ecosystems protection fall under the legislative power of the State (Italian Constitution, Art 117, letter s), while territorial planning is a matter of concurrent legislation between the state and the regions. At the regional level, the regulatory instrument specific to GI is the Regional Ecological Network (REN). The REN is part of Regional Territorial Plan (RTP), which integrates environmental protection in the strategic planning for spatial development at the regional scale. Moreover, there exist some regional initiatives that further integrate GI in spatial planning and can serve as a good example for others to foster their implementation. For example, in Emilia-Romagna, the regional law 24/2017 on urban planning introduced the requirement to assess and consider the ecosystem services for spatial plans of a large-scale (i.e. for the provincial and regional territory). The region Piemonte has also long-standing sectoral legislations and plans – for example, in land management, management of water resources, and protected areas – that promote actions and principles which are key to GI (see Box 4.2 to learn about Piedmont’s legislations relevant for GI).

Despite Italy’s strengthened commitment to sustainable development and the ecological transition4, GI is not yet at the centre of the Italian national debate. Not all relevant actors are fully aware, nor they take advantage of its potential to steer the country towards a more sustainable and resilient recovery. Moreover, the institutional set-up governing GI presents roles and responsibilities that are sometimes unclear and fragmented, resulting in inefficiencies, duplication of efforts, and a lack of co-ordination and implementation.

De facto, there exist multiple authorities dealing with GI (e.g. MIT, MASE, public agencies5, regions, provinces, municipalities, metropolitan cities), but the level of knowledge about what GI is, how it shall be integrated in infrastructure and spatial planning, and how to implement and manage it over its entire lifecycle varies. At the regional and local level, administrations tend to have better competences and more experience with green infrastructures planning and implementation, but the lack of a common national guidance has resulted in heterogeneity in adoption, with some regions and cities performing way better than others (e.g. Lombardy, Emilia-Romagna, Milan, Padua, and Bologna).

Overall, the multitude of actors involved represent an obstacle to the development of an effective framework governing GI at the central level and to their widespread implementation across the national territories.

At the central level, the four main Ministries with competencies relevant for GI are MIT, MASE, MoC, and the Ministry of Agriculture, Forestry, and Food Security (MASAF). They all have certain responsibilities to ensure that environmental and climate considerations are taken into account in infrastructure planning and project appraisal (see Table 4.1). However, reduced co-ordination among them often results in missed opportunities to create synergies across their efforts and develop a consistent institutional framework on GI at the central level.

Another important ministry for infrastructure is the Ministry of Economy and Finance (MEF), which is responsible for the state’s budget and public expenditure, as well as for the coordination and planning of public investments. MEF could thus take advantage of its policy and financing instruments to ensure GI and NbS considerations are integrated into public investment and infrastructure projects, for example, by making this a necessary requirement to access public funding. Moreover, it could allocate specific economic resources (e.g. environmental taxes7) to finance GI planning and NbS projects.

Two other central-level actors that can support the integration of GI in infrastructure planning and implementation are the Regional Agencies for Environmental Protection (also known as ARPAs) and the Higher Institute for Environmental Protection and Research (also known as ISPRA).

ARPA is part of the Italian public administration, and it is the agency responsible for environmental protection. Each Italian region has its own ARPA8. Even though there are differences in the roles and responsibilities of ARPAs across the different regions, they mainly provide technical support to regional and local administrations for environmental protection (i.e. air and water pollution, noise pollution, protection of surface and groundwater, land consumption and soil contamination, biodiversity, etc.). They assist sub-national actors in different areas (see Box 4.3 to know more about the role of ARPA in Lombardy), including territorial and spatial planning, environmental assessments of projects and plans, issuing of environmental authorisations, environmental monitoring, collection of data, training and capacity building, etc.

ISPRA is the national research institute for environmental protection. It gathers data and statistics on GI planning and implementation across the national territory and develops guidelines and recommendations for public authorities and administrations (at the national and sub-national level). Recently, together with ASviS (Alleanza Italiana per lo Sviluppo Sostenibile, i.e. the Italian Alliance for Sustainable Development), it has published the Paper “Infrastrutture verdi urbane e periurbane” that takes stock of the existing policies, instruments, and financial resources for urban forestation in Italian cities. It also suggests a series of policy interventions and actions to better equip local administrations for the planning and management of urban green spaces (Alleanza Italiana per lo Sviluppo Sostenbile (ASviS), 2022[5]).

Moreover, ISPRA takes part in the processes for EIA and SEA, providing technical and scientific support to the Technical Commission to evaluate the quality and completeness of the information submitted by the plan/project’s proponent. For the SEA, ISPRA also assists MASE and regional competent authorities in monitoring, conducts studies and research to develop new methodologies and instruments for assessments, contributes to improve the national normative framework on the subject and develops guidelines to support plan’s proponents and public administrations to go through SEA and comply with the relevant norms (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[8]).

ISPRA together with the 21 ARPAs (including the APPAs - Provincial Agencies for Environmental Protection - of Trento and Bolzano) constitutes the National Network System for Environmental Protection (SNPA). The SNPA was established in 2017 and represents a new entity that helps combine the local knowledge of the territory and environmental issues with national policies on environmental protection. Overall, SNPA carries out different tasks and activities, including: (i) inspections with regards to environmental control functions; (ii) monitoring of the state of the environment; (iii) control of sources and factors of pollution; (iv) research activities to support its functions; (v) technical-scientific support to the activities of state, regional and local bodies with administrative responsibilities in the environmental field; (vi) collection, organization and dissemination of environmental data (Sistema Nazionale per la Protezione Ambientale (SNPA), n.d.[9]).

Through the SNPA Council, the System expresses its binding opinion on the Government's technical measures in environmental matters. Moreover, it can propose to MASE and the Permanent Conference between the State and the regions (including the autonomous provinces of Trento and Bolzano) interventions and solutions (including legislative ones) to align with sustainable development objectives, reduce soil consumption, and safeguard the environment and natural resources (Sistema Nazionale per la Protezione Ambientale (SNPA), n.d.[9]).

Spatial planning is a matter of concurrent legislation between the State and the regions. In brief, the State is responsible for defining the fundamental principles upon which regions draw and enact more detailed norms. In addition to that, municipalities exercise their administrative functions by means of urban regulatory plans and other planning instruments9 (Henriette, Neubert and Marrs, 2019[6]). In exercising their role for territorial planning, as well as in all other responsibilities covering environmental matters, regions are called upon to fully comply with the environmental norms defined by the State.

De facto, GI is often handled at the sub-national level (e.g. regions and municipalities, provinces, and metropolitan cities -, according to the specific competences defined by the regulatory framework), especially in the management of ecological networks and, more generally, in spatial planning and urban strategy instruments.

The ecological network is an interconnected system of habitats which plays a key role in safeguarding biodiversity, especially potentially endangered plant and animal species. It is made up by central areas (core areas), protection bands (buffer zones) and connection bands (corridors) that allow the cross movements of species (animal and plants) and help reduce the risk of extinction of local populations. It mainly includes protected areas and Natura 2000 sites (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[10]).

In Italy, the ecological network can be defined at different administrative levels (e.g. at the regional or local scale), and it is an important instrument to reduce habitats’ fragmentation and ensure ecological connectivity. The extensive work on ecological networks conducted throughout the decades has informed the identification of the territory’s environmental potentials, and it has contributed to building detailed scientific knowledge of the many habitats spread across the peninsula. For this reason, ecological networks are key in the national discussion on GI: ecological networks help maintain and strengthen the connectivity between green areas across the national territory, protecting biodiversity and restoring ecosystem services (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[10]; Ministero dell'Ambiente e della Protezione del Territorio e del Mare (MATTM), December 2013[11]).

For over a decade, ISPRA has been studying the issue of ecological connectivity and habitat’s fragmentation in Italy. Starting from 1997, the institute has promoted the research initiative "Ecological Networks, Multiannual plan of activities for the definition of tools for the ecological continuity of the territory", which had the scope to support the implementation of the EU Habitats Directive. One of the main outcomes of this initiatives has been the publication of the Guidelines for the management of functional ecological link areas (2003), providing practice-oriented indications on the planning and management of green corridors in land policies.

Traditional planning instruments that integrate and manage ecological networks offer opportunities to integrate GI in territorial development (see Box 4.4). Nonetheless, the capacity and willingness to do so vary across sub-national actors. While some municipalities and regions are front-runner in GI planning, others are lagging behind. Moreover, Italy does not have any comprehensive national legislations in place on spatial planning and urban development. This has led to a proliferation of approaches to planning, which represents an additional obstacle to the development of a common approach to GI across the national territory.

Table 4.2 summarises the main sub-national authorities responsible for spatial planning and territorial development, and the tools at their disposal to integrate GI.

Considering the existing governance framework for GI, there is the need for all the different levels of governments involved in territorial development to coordinate and cooperate. Green infrastructure runs across territories, jurisdictions, and sectors, and often depends on the relationship between a number of elements and processes taking place at different scales (e.g. biological, anthropic, landscape, climate, etc.). In other words, it is hard to imagine that GI can be enclosed in one single planning instrument nor that they can managed by a one specific level of government in isolation (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[13]).

Italy does not have a national strategy or policy specific on GI, and this is one of the major obstacles to the widespread adoption and implementation of GI across the country. Nonetheless, references to this instrument have started appearing in key national policy documents. Just recently, the Fourth Report on the Status of Natural Capital in Italy has highlighted the GI potential to reduce the environmental impact and halt biodiversity loss, to restore and enhance ecosystem services, as well as to improve the quality of life in urban and peri-urban areas (Comitato Capitale Naturale, 2021[14]).

Most notably, GI is a key leverage in the National Strategy for Biodiversity to 2030. The Strategy is currently undergoing public consultation, but the draft document repeatedly promotes the use of GI to achieve two strategic objectives: (i) build up a robust and connected network of protected terrestrial and maritime areas; (ii) restore terrestrial and maritime ecosystems. Most notably, the Strategy includes the following initiatives and actions (Ministero della Transizione Ecologica (MiTE), 2022[15]):

  • The introduction of new criteria, mechanisms and fiscal measures to secure investments in protected areas, green and blue infrastructure, and nature-based solutions, as well as to facilitate the monitoring of their performance and benefits. Data can then be used to inform public decision-makers, improve planning instruments, and build new, more fit-for-the-purpose, financing models.

  • Strengthening the considerations of GI and ecological networks in planning instruments and documents for territorial development and public finance. To do so, it encourages the co-ordination across the different administrative levels as well as the improvement of knowledge and technical capacities to manage green infrastructure by public administrations.

  • The integration of GI urban and peri-urban areas to halt ecosystem loss, reduce habitat fragmentation and improve the connectivity across the different pieces of the ecological networks. In particular, it asks all the cities with at least 20 thousand inhabitants to develop an urban greening plan and integrate nature-based solutions in urban planning (e.g. green roofs and walls, phytoremediation, parks, green corridors, trees, urban gardens, grassy canals and ditches for drainage, make paved surfaces permeable, etc.).

The country has further mainstreamed GI in other important national strategies and plans, such as 2017 National Strategy for Sustainable Development, the National Strategy and Plan on the Adaptation to Climate Change, the new Common Agricultural Policy (CAP, or PAC in Italian), as well as in the National Recovery and Resilience Plan (PNRR) and in the Plan for the Ecological Transition.

The National Strategy for Sustainable Development, released in 2017 and currently being updated, emphasises the urgency to halt biodiversity and habitat loss in Italy, as well as to protect, restore and enhance ecosystem services. It mentions GI as an important tool to support sustainable agriculture and food security by strengthening resilience to natural disasters (Ministero dell'Ambiente e della Tutela del Territorio e del Mare (MATTM), October 2017[16]).

The 2015 National Strategy on the Adaptation to Climate Change promotes the use of GI in forests’ management and in the transport sector in order to restore ecosystem services, strengthen resilience to the impacts of climate change and extreme-weather events, especially water-related risks, and support more sustainable public transport modes (i.e. soft/active mobility) (Ministero dell'Ambiente e della Tutela del Territorio e del Mare (MATTM), 2015[17]). The implementation of the Strategy will be guided by the National Plan on the Adaptation to Climate Change, issued in 2018, which is still waiting for the final approval on the Strategic Environmental Assessment. The Plan has the role to guide national, regional and local institutions to develop their own adaptation plans, considering context-specific risks, challenges and enabling conditions. It also highlights the benefits of integrating GI in sectoral planning for tourism, forestry, and urban settlements. Benefits include improved territorial connectivity, the mitigation of the impacts of climate change without compromising the landscape, the restoration and enhancement of ecosystem services (e.g. micro-climate regulation, the mitigation of the heat-island effect and the management of heavy rainfall and flooding) (Ministero dell'Ambiente e della Tutela del Territorio e del Mare (MATTM), 2018[18]).

Even at the sub-national level, various initiatives for climate change adaptation have started taking place, and some of them are also integrating GI. A report published by ISPRA in 2019 provides an overview of the efforts taken by regional administrations to cope with climate change. Most notably, it assesses which regions are engaging in the definition, adoption or approval of plans or strategies for climate change adaptation – even at the sectoral level, as well as in which phase they stand in decision-making process. Overall, Italian regional administrations show a relatively good level of awareness of the urgency of the climate crisis and its impacts. However, there are differences across the national territory, and some regions are performing better than others (for more information on initiatives at the sub-national level for climate change adaptation see Box 4.5).

GI is also part of the National Strategic Plan (PSN) elaborated within the Common Agricultural Policy (CAP) (Ministero delle politiche agricole, alimentari e forestali (Mipaaf), 2021[24]). In particular, among “infrastructures investments with environmental aims”, Natural Water Retention Measures are mentioned as a solution to integrate the need to mitigate hydro-geological risk with the protection and restoration of ecosystems and biodiversity. Moreover, in the section on investments for rural areas, the CAP stresses the need to build new GI and reinforce existing GI assets to ensure connectivity and consolidate the regional ecological networks.

The 2021 National Recovery and Resilience Plan (PNRR) also considers GI, even if just to a limited extent. Under the EU Recovery and Resilience Facility, Italy will be receiving EUR 191,5 billion and it commits to use a large part of these funds (mainly, EUR 54,46 billion) to support the country’s ecological transition. For example, more than EUR 10 billion were allocated to finance sustainable transport infrastructure and mobility solutions within cities. Moreover, with the scope to safeguard air quality and protect biodiversity, the Plan envisages a series of investments for soil protection, restoration of marine ecosystems, maintenance and improvement of existing green areas, as well as for the creation of new green spaces. In particular, it allocates EUR 300 million to the planting of 6.6 million trees (at least 1.6 million trees by 2022) in the 14 Italian Metropolitan Cities10 (Governo Italiano, 2021[25]).

The 2021-2050 Plan for the Ecological Transition (PTE)11 aligns with the PNRR and defines the environmental measures and a timeline to achieve the green objectives set at the international and European level (see the EU Green Deal) by 2050, including climate neutrality and the adaptation to climate change. One of the key areas of intervention is biodiversity and the scope is to halt biodiversity loss, as well as to protect and restore the country’s flora and fauna. In this regard, green infrastructures are often mentioned in the text. More specifically, the Plan intends to strengthen and expand protected areas across the national territory, implement green solutions, such as green corridors or the re-naturalisation of rivers, to improve the ecological connectivity, adopt NbS for the restoration of degraded ecosystems, especially in the urban context, as well as strengthen the monitoring of habitats and species to improve policy making and enhance efforts where needed (CITE, 2021[26]).

In Italy, the Strategic Environmental Assessment is governed by Legislative Decree 152/200612, which transposes the EU SEA Directive (Directive 2001/42/EC) into the national legislation. The SEA is carried out at the plan/programme level for plans, programmes or policies that fall under the competence either of the State or of the regions. Its final scope is to assess the environmental impacts of plans (or programmes and policies) to inform the design process, as well as the process for approval and implementation. For this reason, the SEA must be performed before the plan (or programme and policy) receives the final approval and is implemented. (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[27]).

As a legally required and specifically defined process, the SEA provides an opportunity to systematically integrate GI considerations in a standardised approach into plans, programmes, and policies. Most notably, it requires planners to consider environmental and climate aspects at an early stage of development, when alternatives are still open. Moreover, GI considerations in SEA are likely to feed into the planning of any projects resulting from the implementation of the plan (or programme and policy), as well as in any associated environmental impact assessments.

For plans/programmes/policies that fall under the State’s competence, MASE is the authority responsible to deliver the reasoned opinion – in agreement with the Ministry of Culture (MoC) - which concludes the SEA process. The reasoned opinion is informed by results of the consultation process13 and by the support of the Technical Commission for the SEA, which provides technical and scientific assistance to the Ministry (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[27]). It sets outs recommendations and conditions the plan (or policy and programme) must comply with and also contains the monitoring plan. The monitoring of the environmental performance of the plan (or policy and programme) and its compliance with sustainability and environmental targets is key to identify unforeseen adverse impacts in a timely manner and take appropriate corrective actions. The proceeding authority, in collaboration with the competent authority (i.e. MASE for plans under State’s competences), is responsible for monitoring. Moreover, it can rely on the support and instruments provided by the Environmental Agencies across the national territory and the Higher Institute for Environmental Protection and Research (ISPRA) (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[27]) (Governo Italiano, 2006[28]).

The regulatory framework governing the SEA process envisages the development of the environmental report by the plan’s proponent with the scope to identify, describe, and assess the significant impacts on the environment, and consider different alternatives according to the objectives and territorial scope of the plan (or programme and policy) (Governo Italiano, 2006[28]). The environmental report already provides opportunities to integrate GI considerations. For example, biodiversity, climatic factors, and flora and fauna are specified in the list of factors to be considered, and also the interrelationship between all listed factors14 must be assessed. Moreover, the report should consider any existing environmental problems relating to the areas designated under the Habitats and Birds Directives (European Commission, 2013[29]).

To further strengthen GI considerations in SEA, in 2013, the European Commission issued a guidance document to integrate climate change and biodiversity as standard procedure in strategic environmental assessments (see Box 4.6). The document also suggests consulting the guidance manual “Integrating Ecosystem Services in Strategic Environmental Assessment: a guide for practitioners”, which explains how to better integrate ecosystem assessment, scenario development and economic valuation of ecosystem services into development planning at various scale (national, sub-national and local) (see Box 4.7). GI considerations in SEA process can be integrated not only in the environmental report by the plan’s proponents, but also by the approving authority (e.g. MASE) in its assessment of the report and through the recommendations and monitoring measures set out in the reason opinion.

Infrastructure projects are likely to have impacts on biodiversity, including changes in the ranges of species and habitat types, as well as in ecological dynamics and ecosystem functions. This also implies changes – and potential disruptions - in ecosystem services, in terms of quality, quantity, spatial and temporal distributions (e.g. timing and quantity of water cycling, soil formation, nutrient cycling, etc.) (Geneletti, Cortinovis and Zardo, 2016[31]). Within the Italian framework governing the permit process and the appraisal and procurement of public investments, there are different instruments to assess projects’ impacts on biodiversity and ecosystem services and promote the implementation of NbS. NbS can help mitigate expected negative impacts on different environmental factors, restore degraded habitats, protect animal or plant species, safeguard and enhance ecological connectivity across green areas. Even through NbS considerations are not yet an ordinary practice in the projects’ approval and appraisal process, existing tools can be further strengthened towards this purpose.

The Environmental Impacts Assessment (EIA) is a legally required instrument for projects’ approval and offers an opportunity to systematically integrate environmental considerations relevant for NbS into a wide range of infrastructure investments. Even though both the EU Directive and the Italian national legislation on EIA contain a number of principles that promote NbS considerations, this is not done on an ordinary basis. Most notably, the EIA assesses projects’ impacts on, for example, biodiversity, soil, landscape and climate, but NbS aspects are not yet explicitly included in the requirements of EIA procedures. Moreover, NbS-related issues are complex and multi-faceted, and do not lend themselves to simple or quick analyses.

The EIA assesses a project’s impacts on environmental and human health factors with the scope to prevent any adverse effects (i.e. principle of preventive action15). Most notably, it considers significant direct and indirect impacts on (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[32]):

  1. 1. Population and human health;

  2. 2. Biodiversity - with particular attention to the species and habitats protected under the Directive 92/43/EEC and Directive 2009/147/EC;

  3. 3. Land, soil, water, air and climate;

  4. 4. Material goods, cultural heritage, landscape;

  5. 5. The interaction among all the factors listed above.

In Italy, the environmental assessment of projects is based on the EU Directive on EIA16, which has been transposed into the national legislation and integrated in the national legislative framework on the environment. Today, the EIA is regulated by the Legislative Decree 152/200617 (also known as the Environment Code).

The main output of the EIA process is the Environmental Impact Study (EIS) that is prepared by the project’s proponent and should follow the 2017 guidance by the European Commission “Environmental Impact Assessments of Projects – Guidance on the preparation of the Environmental Impacts Assessment Report”. Accordingly, the EIS includes (Governo Italiano, 2006[28]; Ministero delle infrastrutture e dei trasporti (MIT), 2021[33]):

  • A description of the project (e.g. location, design, size and other characteristics);

  • A description of the likely significant effects on the environment, including in the construction, operation and dismissal phase;

  • A description of the measures envisaged to avoid, prevent or reduce and, where possible, compensate for the likely significant and negative environmental impacts;

  • A description of the reasonable alternatives considered by the proponent, with an indication of the main reasons for the chosen option;

  • The monitoring plan;

  • Any additional information on the project and on the environmental factors likely to be affected;

  • A non-technical synthesis to summarise the main content and results of the Study.

The EIA can either take place at the national or regional level according to the type and scale of the project. For the projects that fall under the State’s competence, the responsible authority is the Ministry of the Environment and Energy Security (MASE). More specifically, MASE has a Technical Commission in place18 that assesses the EIS along with other analyses, studies and documents related to public investment projects, including infrastructure projects, and provides its reasoned opinions (intermediate or final), including recommendations or prescriptions, to the relevant Directorate General19 within the Ministry.

The final decision on EIA is taken with a decree by MASE, which defines the environmental conditions for the implementation, operation, and disposal of the project. The decree can also include recommendations, and request for changes and other measures to avoid, prevent, reduce or off-set negative environmental impacts. Moreover, MASE needs to coordinate with the Ministry of Culture (or MoC). Both ministries need to give their approval on the EIA as the territorial context in which a project is realised does not only have an environmental value, but also cultural one (i.e. landscape). The co-ordination between MASE and MoC is thus key to ensure the project’s area is managed properly, but it is often hard to find a common agreement as environmental needs might be in conflict with cultural requirements.

The competent authority (either at the national and/or regional level) and MoC are also responsible for checking on the compliance with the EIA procedure. In particular, they have the task to identify, in a timely manner, any possible violations to the EIA requirements or to the environmental conditions set out in the final decision, as well as unexpected environmental impacts. The competent authority can then act in different ways according to the issue at stake, and this includes apply corrective measures, withdraw the previously adopted decision on EIA, require a new environmental impact study, send a warning to the project’s proponent to comply with the environmental conditions within a certain deadline, apply pecuniary sanctions, require a suspension of the project implementation, and others (Governo Italiano, 2006[28]; Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[32]).

With the aim to foster the implementation of the EU GI Strategy across Member States, in 2013, the European Commission issued the “Guidance on Integrating Climate Change and Biodiversity into Environmental Impact Assessment” (2013[34]). Given the close interlinks between these topics and NbS, the Guidance represents a key instrument to guide projects’ developers and proponents, as well as approving authorities to take advantage of EIA to promote NbS (see Box 4.8). NbS considerations can be integrated not only in the environmental impact study and the monitoring plan developed by projects’ proponents, but also in the assessment carried out by the approving authority (i.e. MASE) through the conditions set out in its final decision, as well as during its monitoring activity and in the definition of corrective measures.

Moreover, under the PNRR, a Special Environmental Assessment needs to be performed to verify projects’ compliance with the DNSH Principle. This procedure already offered an opportunity to integrate NbS considerations in EIA – as well as SEA. As defined in the “Operational Guidance on the Compliance with the Principle of Do No Significant Harm (DNSH) to the Environment” (2021[35]), the project’s proponent should ensure that all DNSH requirements and constraints are assessed in the environmental permit procedures (e.g. SEA and EIA). Accordingly, nature-based solutions aimed at preventing negative impacts on the biodiversity and climate change adaptation objectives are expected to be part of the EIA.

The Operational Guidance also provides “data sheets” for different types of projects that sets out the criteria to assess compliance with the DNSH. For projects concerning the construction of wastewater treatment plans (see the data sheets n.24), it explicitly states that, under the pollution prevention and reduction objective, NbS measures aimed at avoiding and mitigating excessive rainwater overflows shall be part of preliminary documentation submitted by the project’s proponent for environmental permit processes (Ministero dell'Economia e delle Finanze (MEF), 2021[35]).

Despite a long-standing tradition and experience with environmental impact assessments - often anticipating the evolution of the EU legal and regulatory framework -, the EIA procedure in Italy still faces some challenges that run the risk of hampering the opportunity to integrate NbS considerations:

  • In Italy, the EIA is mainly used to verify projects’ conformity with national and EU environmental norms. Beyond this verification, Italy could benefit from using this tool as an instrument to effectively prevent and reduce negative impacts on the environment and to promote ecological connectivity (e.g. by promoting the use of NbS).

  • Recently, the country has committed to simplify procedures for the environmental assessments of projects20. In 2021, the country approved the Legislative Decree 77/2021, also known as the Simplification Decree bis21, which gave a boost to the country’s effort to streamline environmental procedures in order to ensure the implementation of the projects financed with the PNRR funds22 - as well as for the projects of the National Plan for Complementary Investments (PNC) and the 2030 Integrated National Plan for Energy and Climate (PNIEC). In particular, the Decree has accelerated the timeline for the delivery of the final decision on EIA. For the PNRR/PNC/PNIEC projects that fall under the State’s competence, a special PNRR-PNIEC Technical Commission – which is internal to MASE – has been given the mandate to work full-time on EIA. This is expected to speed up the overall process and help overcome many of the main criticalities associated with the work of the ordinary Commission on EIA/SEA. Moreover, the time and terms for public consultations for PNRR and PNIEC projects have been reduced.

    Beside the potential benefits resulting from the streamlining of procedures, an excessive simplification may negatively affect the opportunity for the competent authorities to gather all the necessary information to be fully aware of a project’s environmental consequences and make the appropriate recommendations.

  • Environmental monitoring helps keep track of the expected environmental impacts to develop corrective actions, as well as to assess the wide range of benefits (environmental, social, and economic) provided by NbS and promote their implementation. While environmental monitoring plans are often envisaged as part of the approval process, they are not always followed by the responsible authorities. After the EIA has been approved there are limited legal, economic, and institutional incentives to carry out a comprehensive monitoring of the environmental impacts of the project.

In order to align with the UN Agenda 2030 and the ambitious EU environmental objectives, Italy has recently adopted a series of initiatives to promote sustainable public investments and support the country’s ecological transition.

According to the 2019 Climate Decree, on 1 January 2021, the Inter-ministerial Committee for Economic Planning (CIPE) was transformed into the Inter-ministerial Committee for Economic Planning and Sustainable Development (CIPESS) with the mandate to ensure that public investments contribute to national sustainable development objectives. CIPESS will now assess public projects’ alignment with Sustainable Development Goals (SDGs) and the National Strategy for Sustainable Development24 (SNSVS), as well as their performance according to the Equitable and Sustainable Welfare (BES) indicators (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36]). Moreover, in December 2021, the Italian Prime Minister Mario Draghi issued the Directive “Guidelines on the action of the Inter-ministerial Committee for Economic Planning and Sustainable Development for the year 2022”. The latter gave start to the institutional process to define the new criteria and methodologies administrations will have to consider when submitting their proposals to the Committee. The final purpose is to strengthen the role of public investments in promoting the country’ sustainable development (Il Dipartimento per la programmazione e il coordinamento della politica economica, (DIPE), 7 December 2021[37]).

Building on this impetus, MIT has defined a new framework for the planning and evaluation of infrastructure projects, which pays due attention to the different dimensions of sustainability (i.e. economic and financial, social, environmental, institutional and governance). More specifically, sustainability considerations are integrated in the planning, as well as in the prioritisation of infrastructure projects and in their implementation.

The new framework includes (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36]):

  1. 1. An update of the guidelines for the ex-ante evaluation of public projects, together with new operational guidelines specific to sectors25 (e.g. railway, road transport, water, public buildings, etc.);

  2. 2. A new scoring system, also known as SIMS, to assess infrastructure proposals along the different sustainability dimensions and define an order of priority for projects’ financing;

  3. 3. New guidelines for the drafting of the Technical and Economic Feasibility Project (PFTE) for the infrastructure projects financed with the PNRR funds26;

  4. 4. New guidelines on how to conduct Public Debate for public investment projects.

The Ministry has also created a new Centre for Innovation and Sustainability in Infrastructure and Mobility (also known as CISMI) to support the research and development of innovative analytical and methodological tools to evaluate the sustainability aspects of public investment projects and their long-term impacts. The Centre will coordinate with other ministries, as well as with the academia and other researchers - both at the national and international level (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36]).

Even though none of the instruments and initiatives envisaged by new framework explicitly integrates NbS considerations, they all offer opportunities to promote their implementation. Indeed, nature-based solutions are key instruments to enhance the sustainability and environmental performance of infrastructure projects. For this reason, MIT should start refining its new evaluation framework to also consider public investments’ impacts on biodiversity and ecosystem services, as well as their advantages in terms of ecological connectivity. These considerations should be given a primary role in projects’ selection and prioritisation.

Under the National Operational Programme for Infrastructure and Networks 2014-2020, the Environmental Task Force within MIT integrated a set of environmental criteria for the selection and award of projects to be financed with EU resources (see Box 4.9). These criteria represent a good example of integration of considerations relevant for NbS in the assessment of infrastructure projects.

The revised version of the guidelines for the ex-ante valuation of public investments requires projects’ proponents to draft a feasibility project. The latter includes an assessment of the project along its key dimensions - economic and financial, social, environmental, institutional and governance –, a sectorial analysis, and it also compares the different design alternatives. The results of this preliminary analysis will later be used in the process to inform the screening phase (i.e. whether a given project will be financed or not) and the scoring mechanism (SIMS) (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36])

With regards to the environmental dimension of the project, both its negative and positive impacts are assessed:

  1. 1. The project’s substantive contribution to the six environmental objectives defined by the European Commission in the EU Taxonomy (i.e. climate change adaptation and mitigation, circular economy, water resources, pollution, biodiversity and ecosystems).

  2. 2. The project’s compliance with the Do No Significant Harm (DNSH) Principle for all the six environmental objectives.

Moreover, the feasibility project includes a carbon footprint estimate for the construction phase of the project through a certification scheme27 and an assessment of the project’s emission balance along its entire lifecycle, including the operational phase. Emissions impacts are eventually compared across different scenarios, including the “do-nothing” (for example, the impact of climate-altering gas reduction favoured by the modal shift as a consequence of the new infrastructure) (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36]).

SIMS’ main role is to help define an order of priority for project financing on an annual basis. Conceptually, it can be applied to any infrastructure proposals, but the level of detail can adapt to the projects’ characteristics and scale (i.e. proportionality), as well as to the knowledge level, capacities and resources of the different public administrations. Moreover, the scoring system provides the ministry with a methodological approach for the selection and prioritisation of investment projects and makes the decision-making process more transparent and accountable to public citizens. It can also be used to support the monitoring during the construction phase of the project to keep track of the expected impacts and/or check on compliance with commitments made at the proposal stage (for example, the use and recycling of materials, control over the sub-supply chain, employment impacts, stakeholder involvement). Results from monitoring can then be shared with the project’s proponent, contracting authorities, and the other entities responsible for implementation (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36]).

SIMS is based on multi-criteria analysis and evaluates both qualitative and quantitative criteria. More specifically, it assesses projects across four different dimensions, which are broken-down into sub-domains with their specific components of analysis, indicators and qualitative information.

  1. 1. Economic-financial dimension, which considers the results of the cost-benefit analysis (CBA) and cost-efficacy analysis (CEA), and the analysis of the project’s impacts on the territory’s economic development;

  2. 2. Environmental dimension, which considers both the substantial contributions to one or more environmental objectives as defined by the EU Taxonomy and as the compliance with the DNSH Principle (see Box 4.10);

  3. 3. Social dimension, which considers the project’s impacts on accessibility and territorial inequalities, employment, and potential benefits to the people involved;

  4. 4. Institutional and governance dimension, which is broken down into the level of coherence with national and European strategic orientations, stakeholder engagement, qualification level of the contracting authority, and control mechanisms on the supply chain or other indicators for the quality of governance.

The evaluation of each sub-domain is performed on a discrete scale of 4 levels [1 min; 4 max], that is continuous and linearly increasing (see Figure 4.2). The final rating is a weighted average of the score received in each of four dimensions, which is in turn determined by the score received in each sub-domain (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36]).

The weight structure is flexible as to reflect the evolution of the Ministry’ objectives and priorities. Besides, in order to ensure some standardisation of the quantitative and qualitative criteria used for the scoring, MIT has developed guiding grids. This promotes homogeneity of the final results, and it is key to reduce subjectivity and ensures comparability of projects across different sectors (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36])

Overall, SIMS helps the Ministry to make better choices in project financing and effectively contributes to the country’s sustainable development and resilience. Even though it increases the workload for projects’ proponents, its main advantage is the creation of a new fiscal leverage that drives them to adopt a more sustainable approach to design infrastructure projects. The system was initially developed with the purpose to help MIT align with the new guidelines for the approval of public investments by CIPESS, but it now aims to become a good practice example that other ministries can adopt and adapt to their own needs.

The Technical and Economic Feasibility Project defines the project’s design and implementation28, and it includes an assessment of the environmental sustainability of the project, also known as the Sustainability Report (Relazione di Sostenibilita’ dell’Opera). For the environmental dimension, the Sustainability Report contains:

  • An assessment of the projects’ impacts and contributions – either positive or negative – to national sustainable development objectives (e.g. the National Strategy for Sustainable Development and the National Strategy for the Ecological Transition);

  • An assessment of project’s compliance with the DNSH principle and its substantial contributions to the six environmental objectives identified in the EU Taxonomy Regulation (852/2020);

  • An estimation of the project’s carbon footprint and energy balance, across its entire lifecycle;

  • A lifecycle assessment of the circularity dimension of the project (i.e. re-use of construction materials, use of second-raw material for construction, waste production, etc.);

  • A resilience analysis which considers all possible risks to the infrastructure and their associated probability. Results are then used to develop solutions that help mitigate project’s vulnerability (e.g. extreme weather events).

For the public investments subject to EIA, the PFTE also includes the Environmental Impact Study and the Preliminary Environmental Monitoring Plan (Ministero delle infrastrutture e dei trasporti (MIT), 2021[33]).

Recently, countries have been strengthening their commitments towards sustainable development and environmental protection, and effective public procurement strategies (from the choice of the delivery mode to the definition of award criteria and contract management) are a key tool they can leverage to meet these promises. To achieve this, public procurement practices and regulatory frameworks must align with long-term development objectives and enable decision-makers to deliver infrastructure projects that bring economic, environmental and social benefits all at once, maximising the value generated for the society as a whole (OECD, 2021[39]). In particular, the regulatory and policy frameworks governing procurement can be improved to correct any distortive incentives and set out the necessary legal and economic conditions to promote nature-based solutions (OECD, 2021[40]).

OECD countries spend almost 13% of their GDP in public procurement, especially in sectors like telecommunication, healthcare, construction, and public transport (OECD, 2021[41]). With the upcoming European funds provided under the Next Generation EU Plan, the number of public investments going through public procurement is expected to increase even more (Fadelli and Fava, October 2021[42]). In other words, public procurers are now given the necessary economic leverage necessary to influence infrastructure investments towards sustainability and environmental goals (OECD, 2021[39]).

While the use of public procurement for the specific purchase and implementation of NbS is still a novelty, the concept of Green Public Procurement (or GPP) is way more familiar to both public administrations and private contractors. The European Commission defines GPP as “a process whereby public authorities seek to procure goods, services and works with a reduced environmental impact throughout their life cycle when compared to goods, services and works with the same primary function that would otherwise be procured”. (European Commission, 2008[43]). GPP constitutes an important tool to promote the use of greener products and services by public authorities and, therefore, to achieve environmental policy goals addressing climate change or biodiversity loss and supporting resource efficiency and sustainable production and consumption.

Even though there exist some clear differences between Green Public Procurement and the procurement of NbS29, GPP’s underlying principles and practices can actually promote the uptake of NbS by public administrations (Mačiulytė and Durieux, 2020[44]).

In Italy, the 2016 Code of Public Contracts30 sets out the procedure and norms for the procurement of public works, goods, and services. Moreover, it makes it mandatory for public contracting bodies to adopt green criteria in their purchasing choices. Italy is one of the few countries31 across the globe where Green Public Procurement is binding at all levels of government. According to article 34 of the Code, all contracting authorities – whether at the national, regional, and local level, and regardless of the contract’s value – must include the Minimum Environmental Criteria (MEC) in their public tenders, at least as technical specifications and contractual clauses. Paragraph 2 of the same article further requires considering MEC in the awarding stage of tenders for which the Most Economically Advantageous Tender (MEAT) criterion is applied.

A first National Action Plan (or NAP) on GPP was issued in 2008 by the Ministry of the Environment, together with the Ministry of Economy and Finance, the Ministry of Business and Made in Italy, and other national technical bodies (i.e. Consip, Enea, Ispra, Arpa). The NAP was later updated in 201332, and it is currently under revision (Ministero dell'Ambiente e della Sicurezza Energetica (MASE), n.d.[45]). The Plan represents the national reference framework on GPP and helps promote its implementation across the national territory. Most notably, it defines national targets to be attained and re-defined every 3 years and identifies the priority groups for intervention (Ministero dell'ambiente e della sicurezza energetica (MASE), 2013[46]).

The NAP is yet to be revised since 2017. In its current form, it is quite outdated in terms of environmental goals and ambitions, and it does not contain any references or targets specific to NbS. Advances in environmental standards and the recent country’s commitments towards climate transition and green infrastructure would urge for refining the Plan to better leverage public procurement to achieve environmental objectives (i.e. halt biodiversity loss and restore ecosystem services) and improve ecological connectivity. Moreover, the absence of political commitment to complete the revision of the NAP is likely to make GPP implementation more challenging as it weakens public procurers’ willingness and incentive to adopt green criteria.

The NAP also includes provisions for monitoring the GPP-uptake by the Italian public administrations and of the environmental benefits attained by green public purchases. Monitoring is key to identify bottlenecks in the existing frameworks and tools and develop appropriate corrective actions (i.e. training, awareness raising campaigns, workshops, etc.) and solutions to the dysfunctional elements (Ministero dell'Ambiente e della Sicurezza Energetica (MASE), n.d.[45]; OECD, 2015[47]).

While the 2016 Code mandates the National Anti-Corruption Authority (ANAC) to monitor GPP implementation, to date no report has yet been published. Instead, the reporting system in place suffers from several weaknesses. It mainly relies on an online survey to be filled in directly by the RUP (i.e. the Unique Responsible for the Procedure, Responsabile Unico per il Procedimento) of a given public tender, before 31 July every year. However, information gathered from the survey is relatively limited since it merely checks if MECs were included or not. Moreover, given the absence of public reports, the level of compliance by contracting authorities remains unknown. The absence of a sound monitoring system to check and, potentially, punish the non-compliers also runs the risk to further weakening public administrations’ efforts to adopt GPP.

The existing weaknesses of the GPP monitoring system in Italy run the risk to hamper the potentials of public procurement to promote the widespread implementation of NbS by public administrations. As things stand today, it would be difficult to know how whether or not contracting authorities are purchasing nature-based solutions, how much and how well these NbS are actually performing. In the absence of such information, it is hard to intervene on the existing regulatory framework to improve it and make it more effective in promoting the procurement of NbS across the national territory.

To fulfil the monitoring vacuum, the Osservatorio Appalti Verdi (Green Public Tenders Observatory) – an initiative led by Legambiente and Fondazione Ecosistemi, with the support of other actors33 - has been measuring the adoption of MEC by different contracting authorities since 2018. Every year, it publishes a report on GPP uptake in Italy. Results show that Italian Public Administration has improved its knowledge and practice of GPP over the last 4 years. However, MEC are still far from being fully implemented despite the existing legal obligation (Osservatorio Appalti Verdi, 2021[48]).

The NAP on GPP identifies the priority sectors for which MASE has to draft the MEC to be included in the different stages of the tendering procedure. These product/service categories are selected based on a multi-criteria analysis that considers different factors, including the volume of public expenditures (i.e. economic relevance), the scope of environmental improvement, as well as the market readiness to comply with green requirements (Hasanbeigi, Becqué and Springer, 2019[49]).

The NAP on GPP outlines the process for MEC development. The latter follows the EU Commission’s process for EU GPP criteria, but it adapts to the specificities of the national production system. The criteria are mainly based on a market analysis of the sector, different reference sources suggested by the European Commission – i.e. EU GPP criteria, existing eco-label criteria, EU sectoral norms with an environmental character (Directive ERP, for example) -, as well as information collected from businesses and trade associations, consumers and users, and the public administration (Ministero dell'ambiente e della sicurezza energetica (MASE), 2021[50]).

The definition of MEC falls under the competence of the GPP Management Committee34, which is coordinated by MASE. The Committee works together with technical working groups, representatives and experts of the public administration and central purchasing bodies, research institutes and universities, trade associations and economic operators. Once drafted, MEC are shared with other ministries, mainly the Ministry of Economy and Finance and the Ministry of Business and Made in Italy, to collect further comments and feedback. As a final step, MEC are adopted by means of a Decree by the MASE, which is published in the Official Gazette (Ministero dell'ambiente e della sicurezza energetica (MASE), 2021[50]).

MEC are defined for some or all the stages of the procurement procedure, including the subject matter of the contract, technical specifications, award criteria, and contractual clauses. Moreover, for each green criterion, information is also given on the appropriate means, documents, and mechanisms to verify compliance (Ministero dell'ambiente e della sicurezza energetica (MASE), 2021[50]).

To date, Italy has adopted MEC for 19 different categories of goods and services (see Table 4.4), some of which are currently under review (i.e. construction, management of waste and internal furniture). New MEC for other product and service categories are also expected to be defined in the coming future (Ministero dell'ambiente e della sicurezza energetica (MASE), 2021[50]). Each year, MASE shall set out an annual work plan to draft new MEC, as well as to review the existing ones. For the review process, MEC are periodically updated also considering the technological evolution and market developments for each product/service category.

Among the new categories for which MEC are planned to be defined, there are also design and works services for new road constructions and road maintenance and public transport services. For the MEC to be revised, energy services for public buildings and urban furniture are pending.

To date, the MEC for the creation and management of public green spaces (Ministerial Decree of 10 March 2020) are the only example including specific requirements for the adoption of NbS. The corresponding Ministerial Decree specifies that every urban green element is part of the city’s network of green infrastructures. For this network to be effective in providing ecosystem services, it is necessary to adopt solutions that mimic nature’s criteria and rules, also known as nature-based solutions or NbS. Accordingly, the MEC provide a series of indications to guide the selection of plant species for the management of existing public green spaces (Ministero dell'ambiente e della tutela del territorio e del mare (MATTM), 10 Marzo 2020[51]):

  • The pool of selected species should be consistent with the site, both in terms of flora and vegetation;

  • Selected species should be autochthonous in order to safeguard nature conservation;

  • Consider the changing climate conditions and pollution factors relevant for the geographic area under scrutiny;

  • Assess the impacts of the selected species on human health as well as the risk of uncontrolled spread of the species;

  • Select a pool of species belonging to plant associations consistent with the range of the site’s potential vegetation and with the specific ecological conditions of the area;

  • Select species with low water consumption, high resistance to environmental stress and phytopathologies, and with the best potential to activate autonomous capacity of organization towards more advanced forms of plant communities;

  • Select tree species specific to the intended use.

Likewise, for the construction of new green areas, the MEC require to consider the following aspects for the selection of plant species (Ministero dell'ambiente e della tutela del territorio e del mare (MATTM), 10 Marzo 2020[51]):

  • Adaptability to soil and climate conditions;

  • Resistance to phytopathologies of any kind;

  • Resistance to urban stress and heat island effect;

  • The existence of obstacles or constraints to the future development of the selected plants;

  • The presence of native or historicized vegetational species having an identity value for the local territory.

Except for this case, all other MEC do not include any specific requirements for NbS. Overall, MEC build upon a series of environmental principles that are likely to promote the purchase of NbS by public procurers, such as resource-efficiency, limited use of chemicals and hazardous substances, sustainable waste management, eco-design principles, recyclability, re-use of components, and so on (see Box 4.11) (Ministero della Transizione Ecologica (MiTE), June 2022[52]; Iyer-Raniga and Finamore, 2021[53]). However, more needs to be done to fully take advantage of MEC’s and GPP’s potential to support a systemic and widespread implementation of NbS in public investments. For example, the GPP Management Committee could develop and/or refine existing MEC to also take into account biodiversity conservation, restoration of ecosystem services and ecological networks. Product and service categories such as road construction and maintenance, public transportation, design and construction of public buildings and urban furniture seem to be a good place to start integrating considerations and requirements relevant for NbS.

The process of transport infrastructure development in Italy is very articulated, with a strong hierarchy among the levels of governance. Effective processes require good co-ordination among different governance levels. This is primarily due to the territorial layout of the country of twenty regions consisting of numerous provinces (although the governance level at the provincial level has been abolished). Regional governments are involved in identifying areas for the construction of infrastructure and coordinating among a large number of local municipalities. Municipalities within provinces have their own transport development plans, e.g. Sustainable Urban Mobility Plans (SUMPs). State government plays a key role, but regions, metropolitan areas and municipalities may have different opinions of the planned works, and the state needs their consent to operate. Italy has developed a set of rules requiring the approval of the Conferenza dei Servizi, which gathers all relevant public and municipal entities for certain projects.

Sustainability is a priority in Italy for the government and transport infrastructure stakeholders. However, in the Italian transport sector, stakeholders perceive GI mainly as means to avoid and mitigate emissions and improve sustainability, and this differs from the GI definition used in this study. The country is highly committed to decarbonising the transport system and improving living conditions, e.g. by renewing bus fleets, stimulating a shift from private to public mobility, and electrification of rail and ports supported by PNRR. A good example is the Italian rail network, which today is Europe's most electrified rail network. Moreover, most of the policy measures implemented in the transport sector, such as the application of DNSH to transport projects, currently have a higher focus on mitigation and lacks closer connections with adaptation and biodiversity enabled by GI.

While mitigation measures are crucial for sustainable infrastructure development, climate adaptation goals should not be overlooked, as integrating the development of grey and green infrastructure can strengthen Italy’s resilience to the impact of climate change and bring benefits to the ecosystems. Moreover, the fragmentation of vast areas of the nature of the country’s rich landscape, including its effect on biodiversity, should not be overlooked.

In terms of infrastructure planning, once MIT prepares the strategy, individual projects are then integrated into this strategy. In the current practice, challenges exist in integrating existing transport infrastructures into strategic plans to avoid conflicts. Oftentimes, it creates clashes with local governments and procedures in place and causes delays in implementation and issues with quality. A good example of a fund aimed at improving urban mobility is the National Operational Programme "Città Metropolitane" (NOP Metropolitan Cities). The goal is to improve the quality and efficiency of urban services and social inclusion for the more fragile population. The European Commission acknowledges it as good practice35.

Regional differences exist in how the impacts of railway infrastructures are perceived in Italy, as revealed from the stakeholder interviews. In the south of the country, due to the high need for the work to be accomplished, the local administrations place more emphasis on economic development, thus putting more weight on the provision of the infrastructure. Nevertheless, the social and environmental impacts are also considered in the railway infrastructure development in the south of Italy, complying with European and national legislation. This could include riverbed restoration, underpasses, overpasses, etc. Additionally, National Operational Programme projects with a value of over EUR 60 million require extra investigation.

The assessment also includes mitigation measures for the impact of the railway infrastructure during and after the construction (operation), e.g. protecting habitats and emission levels during implementation and operation (e.g. construction sites). Construction sites for railway and road projects will usually be located in areas where they cause limited environmental impact.

The Directorate-General for the Supervision of the Authorities of the port system, maritime transport and inland waterways at MIT is working on decarbonising the maritime sector, making the sector more sustainable, and complying with UN 2030 objectives. Several sustainable interventions in ports are being done, such as:

  • Reforms to simplify procedures and improve and strengthen the infrastructure's resilience;

  • Operational changes to simplify planning at the ports. This includes a strengthened role of regional port authorities and the Ministry;

  • Implementation of special economic zones as part of PNRR;

  • Strengthening of port management and port planning to improve the adoption of the Ministry’s guidelines;

  • On-shore charging for vessels: EUR 700 million have been allocated for the construction of this intervention;

  • Retrofitting of existing vessels: EUR 500 million have been allocated;

  • Stimulating the wider use of LNG by building LNG plants: EUR 217 million have been allocated.

  • Improved port-city area interactions to improve access to boats and vessels;

  • Establishing an ad-hoc centre to support sustainability.

  • Electrification measures are currently being developed. There is an ongoing discussion with the Italian association of ports (i.e. Assoporti) to understand their needs, as well as talks with vessel owners' associations. Then, the right calls for tender can be developed to make effective infrastructure development decisions.

For urban mobility, the main objective at the national level is the transition to public transport in municipalities of more than 100 thousand inhabitants. This will result in a reduction in traffic, reduction in emissions, and improved quality of life. The central administration supports this transition. Regions are responsible for investments and will involve the municipalities. Twelve billion euros have been allocated to the transition, of which 4.5 to renew bus systems. These state funds are allocated to regions and municipalities.

Compliance with existing laws is assessed in the framework of SUMPs. The Directorate-General for Local and Regional Public Transport and Sustainable Mobility monitors the implementation of SUMPs. MIT and MASE establish the guidelines of the SUMPs together.

Decisions for investments in regional transportation are made at state-regions conferences, which are a platform where political agreement is reached between state and regional governments. ANCI, the municipalities association, also takes part in these conferences.

In agreement with the regions and municipalities, green corridors and spaces could also be possibilities. These are currently not explicitly considered, although there are some examples of urban reforestation not specifically linked to GI and urban transport.

Italy has a well-developed knowledge base and planning structure for sustainable infrastructure and emissions mitigation. There is much emphasis on mitigating greenhouse gas emissions by avoiding and reducing them through several procedures ranging from governance and legislation to assessment mechanisms, such as environmental impact assessments and new assessment procedures initiated by MIT. The established and transparent procedure of assessment mechanisms could, in theory, offer opportunities to integrate GI into the transport planning process. However, there is no clear-cut definition of GI, and climate adaptation is not one of the main concerns in transport planning. Moreover, the benefits of GI are not fully and explicitly considered in the assessment methods. Therefore, more attention is needed for GI to make it an integral aspect of the transport planning process.

The technical and economic feasibility study (through CBA) and environmental impact assessment (EIA) are separate procedures without co-ordination or interaction. Ideally, the CBA would include the elements of EIA, and a comprehensive EIA should also have social and economic outcomes. Thus, ideally, both assessments should converge. For Italy, although NBS are considered in some aspects of EIA (e.g. soil, biodiversity, water), other impacts coming from implementing NbS should be more explicitly integrated as part of the evaluation criteria of the EIA, and national strategies to incorporate the GI and NbS need to be further encouraged. Furthermore, the consideration of GI integration should also be better reflected in the Strategic Environmental Assessments (SEA) at the programming level and the EIA at the project level, as advised by the European Commission.

Italy operates on several government levels, of which the main three are the state, the regions and the municipalities. Because of the large number of regions, provinces, Metropolitan Cities and municipalities, communication between all government levels is complex. In addition, GI is physically established in the local area, for which the contractors and the municipality must negotiate. This is a reason for concern, as the transport infrastructure still needs to be consistent with the strategic planning.

The Palermo-Messina railway is part of the Trans-European Transport Network (TEN-T). Palermo-Messina is a high-speed connection, and it is part of the subproject Berlin-Palermo of the Scandinavian-Mediterranean Corridor connecting Germany to the South of Italy, crossing through Austria. Moreover, with the possibility of extending from the mainland to Sicily by the Strait of Messina Bridge, the railway line could offer better connectivity of the South with the rest of Italy and support opportunities for the further economic development of the region.

Palermo-Messina is an existing connection in the Italian rail network. It will be substantially upgraded in the context of TEN-T. The main objective is to speed up the current line with an electrified double-track that allows 250 km/h speeds and complies with EU interoperability requirements. These upgrades and the necessary construction offer opportunities for further consideration of green infrastructure along the rail line.

This case study focuses on the Bicocca-Catenanuova section of the Palermo-Messina railway line, located in the eastern part of Sicily.

The air connection between Catania Airport and Fiumicino Airport is currently very intensively used, with a large number of flights operating between the two cities. Besides, there is a lack of a rail connection between the two cities. Moreover, the existing line in Sicily is not up to the standards of pan-European rail corridors36.

Milan-Rome used to be an air connection with comparable intensity, but since the opening of the high-speed rail line between them, it has become more popular to travel between the two cities by train. A similar mode shift could be expected with the improvement of the rail connection from Palermo, through Catania and Messina, to Rome. However, a gap in the connection between Messina and the mainland will remain since plans for the controversial Strait of Messina Bridge have been set aside over the past years. The rail connection will therefore have to rely on ferries for connection to the mainland.

The island of Sicily has three main cities: Messina, Catania and Palermo, and many medium-sized cities. Transport between these cities is mostly car-based as the existing railway is not competitive with car-based travel times. Moreover, many public and private transport services overlap with the train service. Rail is not an attractive, competitive mode due to the inconvenience of multiple interchanges needed. Frequent maintenance on highway segments often temporarily pushes a mode shift to rail but rebounds due to no direct train connections. For these reasons, the new rail connections need to be fast, connect the island's three cities and serve the towns in between. Therefore, high-speed rail was not a good option, but rather an upgraded railway with intermediary stops to guarantee accessibility to local communities, higher speeds and better connection times than the previous one.

The Palermo-Catania railway upgrade is split into six sections, as shown in Figure 4.3. It is based on upgrades to the existing railway and also includes newly built sections.

The upgrade of the 37 km-long track between Bicocca and Catenanuova consists of doubling the tracks (currently, only a single track is available and this causes delays) and upgrading the existing tracks to support higher speeds of up to 160 km/h. This will reduce the travel time between Catania and Palermo from about three hours to two hours. After completion of the project, the railway will use a signalling system compatible with ERTMS, thus complying with European standards and fit for integration into TEN-T. With the outlined upgrades, the section's capacity should increase to 150 trains per day, with the travel time decreasing from 25 to 17 minutes between Bicocca and Catenanuova.

According to the Independent Quality Review37, the project consists of six elements:

  1. 1. Upgrading the existing track and constructing a second track for the entire length of the section;

  2. 2. Construction of two tunnels;

  3. 3. Construction of 17 viaducts;

  4. 4. Upgrading the station in Sferro and building a new station in Motta Sant’Anastasia;

  5. 5. Removal of three stops in the stations of Gerbini, Portiere Stella, and San Martino Piana;

  6. 6. Upgrading the Bicocca station.

Unused sections of the existing track will be removed. Such space will be given back to the community in the form of pedestrian and bicycle trails and will be used for the planting of trees.

The Palermo-Catania railway is financed by European and national funds. Sections 3 to 6 (including Bicocca-Catenanuova) are included in the PNRR and are thus subject to PNRR’s environmental reporting requirements. Almost 30% of the financing of the Bicocca-Catenanuova section comes from European sources (ERDF and Resilience and Recovery Fund). RFI is the project's beneficiary and manages the infrastructure over its entire lifecycle.

The rail line does not cross any natural areas in Sicily, although it is in the proximity of several Natura 2000 areas (shown in Figure 4.4): Lago di Lentini is 1.9 kilometres away from the track; 2.7 kilometres from Foce del Fiume Simeto e Lago Gornalunga; 5.5 kilometres from Contrada Valanghe; 6.1 km from Tratto di Pietralunga del Fiume Simeto. The environmental management plans of all these sites are integrated into the management plan for the Simeto river, which is crossed multiple times by the rail section. The Natura 2000 sites themselves, however, are crossed by neither the existing nor the newly planned sections, and the works comply with the criteria laid out in the Simeto management plan. However, these plans have not considered possibilities for connecting the sites by means of GI.

The Bicocca-Catenanuova section conforms to the National Operational Programme Infrastructure and Networks and National Transport Plan, for which SEAs have been carried out.

An EIA was carried out for the individual project. Some mitigation measures came forth from the EIA, mostly related to minimising construction impacts38. The costs of such mitigation measures were carried over to the CBA. Moreover, public participation was part of the EIA – in accordance with the European and national legislation.

Bicocca-Catenanuova is not a competitive railway structure when compared to other modes. The Ministry’s primary objective was to accomplish the work of Bicocca-Catenanuova. For this project, there was little to none resistance by local communities, as they were not directly affected by the construction of the infrastructure. However, in some other cases, local communities might protest and ask for compensatory measures. According to law, compensatory measures should be related to the scope of the public works, but this is not always the case. For example, local municipalities might ask for the construction of a new school or for other solutions whose scope often goes beyond that of the specific project under scrutiny.

An environmental monitoring plan was also established, which includes plans to refurbish the areas of the removed existing tracks into bicycle and pedestrian areas with green spaces. The environmental monitoring plan includes indicators to monitor before, during, and after the construction phase, for the entire lifecycle of the work. The plan includes monitoring for potential future issues and existing issues. For example, during the creation of the environmental monitoring plan, issues such as water contamination were discovered. These have also been included in the environmental monitoring plan.

According to the independent quality review, several options analyses were carried out, but climate change adaptation was not considered. The environmental monitoring plan contains eight components, as summarised in Table 4.5.

A cost-benefit analysis (CBA) has been carried out in preparation for the project. In the CBA, two alternatives were compared: a zero-alternative (the existing rail line) and the upgraded line - as described in this case study. Judging from the Jaspers report39, the CBA exclusively assessed the financial feasibility and did not include the potential monetisation of environmental benefits or costs associated with the project.

An Italian construction company has been working on the construction since the beginning of 2019, with close attention to the environment. In addition, an engineering company are performing remote sensing studies to monitor the impacts of excavation works carried out for building the infrastructure. The construction phase is part of the environmental monitoring plan, which was included in the EIA.

As stated before, the third part of the environmental monitoring plan includes the operational phase. Indicators monitored during this phase are air quality, surface and groundwater, soil, noise, vibrations, and biodiversity (flora and fauna).

The planned structure will include several GI elements:

  • Unused sections of the existing track will be removed. This space will be given back to the community in the form of pedestrian and bicycle trails and for the planting of trees. Moreover, these infrastructures are connected to the existing cycling network in Sicily.

  • Additional vegetation natural to the surrounding area will be planted alongside the infrastructure. This will happen in riverbeds, across intersections, and in small spaces between the tracks and a parallel road. The vegetation is limited to a small corridor next to the rail line and cannot interfere with, for example, existing agricultural land.

  • During the ongoing construction phase, the environmental impacts of excavation works are strictly monitored.

  • During the monitoring phase, multiple GI-related indicators, such as vegetation, soil quality and fauna are monitored.

It can be observed that GI have already been well-integrated into the project for aspects related to indicators and monitoring. However, these indicators fail to precisely reflect the purpose of GI, namely limiting or reversing habitat fragmentation by connecting natural areas and thereby safeguarding and improving ecosystem services.

In addition to that, considerations of the spatial uptake of nature-based solutions remains limited. A railway line offers the opportunity to create green belts lateral to the ballast created with a mix of natural elements (trees, shrubs, grasses), contributing to the enrichment of ecological networks as secondary lines of connectivity. In the case of the Bicocca-Catenanuova track-doubling project, considering the phytoclimatic characteristics of the site, only localised interventions have been envisaged in certain areas (interconnected areas, residual areas following the decommissioning of roads or railways or due to the demolition of buildings, at the base of viaduct abutments,). For this reason, the project also includes measures to reduce the risk of ecological fragmentation by identifying elements of existing ecological networks to be upgraded and the appropriate measures to complete the 'design' of the ecological network to be created. For example, the banks of the Simeto river affected by the project will be the subject of an intervention to plant native shrub species consistent with the surrounding ecological environment and belonging to the potential vegetation series. More generally, interventions to upgrade the riparian vegetation are planned for all the crossings of the minor hydrographic network.

An international best practice where co-operation between public authorities and infrastructure managers such as RFI (ProRail in the Netherlands) work together to improve the integration of infrastructure and nature is stimulated, was the Dutch Green Deal Infranature initiative (also elaborated on as a planning initiative for GI in chapter 3). One of the projects under the initiative was an upgrade to a highway, with nature enhancement as one of the tender requirements. This forced contractors to come up with nature-inclusive designs and use the highway upgrade as a means to enhance nature and use the infrastructure as a connecting corridor.

The construction of the Bicocca-Catenanuova section as part of the railway Palermo-Catania-Messina mainly aims to create a modal shift from road transport to rail and reduce greenhouse gas emissions. Green stations, biking paths and green areas are planned as part of the project, which will enhance the green dimensions of the infrastructure. However, these greening measures are not meant to integrate the railway with the surrounding nature. Green infrastructure was not explicitly studied in the planning and assessment of the line. This is understandable, as it was an existing line crossing through agricultural land, not natural areas. The Natura 2000 sites in the proximity are untouched by the infrastructure, but there is a missed opportunity to integrate GI into the project by using it to connect the surrounding natural areas.

Railway lines like these should be used as an opportunity to expand natural areas. A solid procedure for these considerations should be in place for similar projects in the future. Even though not essential in this case, standardising the integration of GI considerations into infrastructure planning could help protect the natural landscape in future instances in which it may be needed.

Some recommendations for improving the integration of GI into such types of projects are:

  • GI should be integrated into the regional spatial planning. This would help ensure that infrastructure projects like the Palermo-Messina railway can offer an opportunity to connect natural areas that are fragmented by years of human development.

  • More collaboration is needed between RFI and the local administrations: the territorial administration needs to be engaged in the project to allow for the greening of more natural areas besides narrow corridors.

  • Environmental impacts should be included in the CBA. GI can create monetary benefits over time (e.g. through recreation), so integrating GI into CBA would be beneficial to fully consider its relevance, costs and benefits over the lifetime of an infrastructure project.

  • The impacts of the infrastructure should be monitored with a stronger emphasis on GI. This can be done with more refined indicators reflecting the continuity of biodiversity, fragmentation of habitats, and total surface of natural areas around the infrastructure.

Metro 4 is a new metro line in Milan that will cross the city east-west, from Linate Airport to San Cristoforo railway station. The line connects to the existing metro lines 1, 2 and 3 at San Babila, Sant’Ambrogio, and Missori (Sforza-Policlinico for line 4), respectively. The metro line ensures a good connection between Linate Airport and the city. Metro 4 will be 15 kilometres long with 21 stations and pass through the historic city centre of Milan.

The metro line is now partly in construction and partly in operation. The first phase of the metro line is already operating, and the subsequent phases will become operational over the course of the following years until 2024. Once completed, M4 should be able to serve 24 000 passengers per hour. This offers an excellent opportunity to shift travellers from more polluting private modes to public transport, thus reducing GHG emissions.

The metro line can serve as a mean to stimulate a transition from private mobility to public mobility, which is the main objective for urban transport on the national level. The national administration plans to achieve a transition to public transport in municipalities with more than 100 000 inhabitants. This will lead to reduced traffic, and therefore reduced emissions and improved quality of life.

The planned metro line specifically contributes to these objectives because it crosses major centres of interest in the city. With Linate Airport on one end of the line, San Cristoforo station on the other end, and crossing the city centre of Milan, it crosses the city east/south-west and offers connections between the entire urban area of Milan to international destinations. Furthermore, the metro line offers additional transport options along important transport corridors in the city, e.g. Lorenteggio-Foppa and Forlanini-Argonne. It also provides a partial alternative to the Bisceglie branch of metro line 1 (Comune di Milano, Consorzio MM 4, SPV M4, 2012[55]).

According to Webuild, the metro line could reduce the daily number of car trips in the metropolitan area by 180 000, bringing a CO2 reduction of 75 000 tonnes annually (Webuild, n.d.[56]). The Environmental Feasibility Study mentions different numbers: a reduction of 3.69 million car trips per year (10 000 daily), saving 10 310 tonnes CO2, 18 052 kg Nox and 1 511 kg PM10 annually. It is expected that 86 million trips will be made using this metro line every year.

The metro line will have a length of 15 kilometres and run entirely underground (except for the depot area), consisting of two single-track tunnels. The metro line will be fully electrified and operated by an automated, driverless system with automatic platform doors. The fleet will consist of 47 vehicles, which can run at a maximum speed of 80 kilometres per hour. In some sections that pass under the city centre, the maximum will be 50 kilometres per hour. The line will be able to transport 24 000 passengers per hour in each direction with a frequency of one train every 90 seconds (Comune di Milano, Consorzio MM4, SPV M4, 2012[57]).

The work consists of three sections: one section from San Cristoforo to Sforza/Policlinico (6.5 kilometres with 13 stations), the other from Sforza/Policlinico to Forlanini train station (4.2 kilometres including 5 stations), and the last from Forlanini to Linate Airport (the so-called EXPO-route, 3.5 kilometres with 3 stations). The entire route can be seen in Figure 4.5. As is clear from this map, the line offers several connections to the existing transport system in Milan. From west to east, these are the following:

  • San Cristoforo FS: connection to train line S9 (suburban rail)

  • Sant’Ambrogio: connection to metro line 2

  • Sforza-Policlinico: connection to metro line 3 (on which the station is called Missori)

  • San Babila: connection to metro line 1

  • Dateo: connections to train lines S1, S2, S5, S6, and S13 (suburban commuter rail lines)

  • Forlanini: connections to lines S5, S6, and S9 (suburban commuter rail lines)

  • Linate Airport: connections to (inter)national destinations

Milan’s metro line 4 is part of the wider mobility strategy: the city’s Sustainable Urban Mobility Plan (SUMP), which is seen as a best practice in Italy. Milan’s SUMP is a strategic planning tool aiming to provide a mobility plan to accommodate transport demand in the metropolitan area. The SUMP is part of the national strategy for sustainable transport, intending to reduce emissions and improve quality of life by transitioning from private to public mobility and fleet renewal to zero-emissions technology (e.g. EUR 4.5 billion have been allocated to bus fleet renewal).

Milan’s latest SUMP was approved by the Council of the Metropolitan City of Milan in April 2021. A SEA was part of the creation of the plan (Citta' Metropolitana di Milano, April 2021[58]). The central government defines the objectives, regional authorities are responsible for how the funding is invested, and municipal governments execute the plans.

The compliance of mobility plans and projects with existing laws is assessed in the framework of SUMPs. The guidelines for SUMPs are finalised by MIT and MITE, with a monitoring committee consisting of representatives from the relevant institutions, including the regions. Investments in regional transportation are agreed upon at state-regions conferences, a venue where political approval is reached between the state, regional governments, and ANCI (the municipalities association). The MIT Directorate for Local and Regional Public Transport and Sustainable Mobility then monitors the implementation of the SUMPs. If there are any assessments related to adaptation to be performed, they should be part of the SEA that is carried out when finalising the SUMP.

In the regional context, three plans are relevant to the metropolitan area’s opportunities to integrate GI.

  • First, there is the Territorial Plan of the Province of Milan (PTCP), which includes guidelines for spatial planning in the province. The plan includes objectives that are highly relevant when considering GI. One objective states that all transformations in the territory should be assessed against the quantity and quality of natural resources (air, water, soil, vegetation) and should protect and enhance the landscape. Another objective concerns the reconstruction of the province’s ecological network, biodiversity, and the creation of ecological corridors. Finally, there are two objectives related to limiting urban sprawl and increasing the quality of life in the city through increasing public areas, particularly green areas, and environmental regeneration (Comune di Milano, Consorzio MM 4, SPV M4, 2012[55]).

  • The other highly relevant plan, especially for metro line 4, is the Regional Plan of the South Milan Agricultural Park (PRTA). This plan concerns a regional metropolitan green belt park, integrating agricultural areas with natural green spaces and providing green connections between the city and the countryside. It also includes an identification of areas that must be protected to preserve the landscape. Any plans under the PRTA that significantly impact the objectives as laid out in the PTCP should also be approved by the regional authority. San Cristoforo and Forlanini Park, both stops on the metro line, are part of this PRTA.

  • The last regional plan related to GI is the Forestry Master Plan of the Province of Milan (PIF). This plan includes a mapping of all woods and areas with trees in the province and gives guidance on the further development and management of these wooded areas.

The initial project was approved in two phases. The preliminary project for Lorenteggio to Sforza/ Policlinico was approved in August 2007, while the preliminary project from Sforza/Policlinico to Linate was approved in August 2008. The final project was then drawn up in 2013. Therefore, the environmental feasibility study (2010) also included an elaboration on the Analysis of Environmental Problems for the Lorenteggio-Sforza/Policlinico section and the Environmental Prefeasibility Study for the Sforza/Policlinico-Linate section. The study concludes several significant environmental impacts, especially during the construction phase, even though the metro line is, naturally, built underground. The main impacts identified in the study were:

  • Land occupation by construction sites – to be restored after the construction phase;

  • Impact on roads and traffic flow – changes in the layout of roads by the occupation of construction sites could lead to the generation of heavy traffic conditions;

  • Changes to the urban and peri-urban landscape;

  • Production of dust and local pollutants by construction activities;

  • Noise during both construction and operation (during operation, mostly related to ventilation systems);

  • Vibrations during the construction phase;

  • Spread of invasive species induced by construction activities;

  • Impact on the enjoyment of spaces by the city’s inhabitants – notably mainly related to public green spaces that would be affected by the construction works.

Two main mitigation measures were proposed to mitigate the abovementioned impacts. The first measure was reducing the construction time by applying appropriate construction techniques and efficient planning. The second measure was to limit the surface taken up by construction sites and use these spaces as efficiently as possible. Therefore, two main construction sites were assigned to the project, both in the peripheral areas of Milan (Comune di Milano, Consorzio MM4, SPV M4, 2012[57]).

Moreover, there are several mitigation measures geared towards specific environmental impacts. Physical barriers will be installed to combat dust generation, and construction roads will be wetted to prevent dust from being stirred up by vehicles. To mitigate noise by excavations, soil movement and production of construction materials, three measures were taken: installation of physical barriers, scheduling the works during the daytime, moving noise sources away from inhabitants and the use of equipment with up-to-date maintenance. Regarding impacts on soil, several measures were introduced: metal containers for the collection of waste, dedicated areas for the storage of waste materials, and environmental management of potentially polluting/contaminating activities (avoiding refuelling of vehicles within the construction site, immediate removal of oil, grease, and hydrocarbons spilling). The General Report for the Final Design does not mention mitigation measures to be taken that could limit environmental impacts during the project’s operational phase. Moreover, it does not mention measures related to green infrastructure integration.

As part of the work, an environmental monitoring plan has been established. The plan includes prescriptions for the methodology, regulation, sampling frequency and times, and locations where the following indicators should be monitored: noise, atmosphere (local pollutants), vibrations, traffic and viability, groundwater environment, and vegetation (Comune di Milano, Consorzio MM4, SPV M4, 2012[59]). A separate report has been published to detail the monitoring plan for each of these indicators. The General Report mentions an Environmental Management System with guidelines for controlling and monitoring environmental impacts during the construction phase. The Environmental Monitoring Plan itself mentions that during the operational phase, only the noise, vibration and vegetation components will be monitored by the infrastructure manager. All measurements will be compared to the initial state of the environment, as defined by measurements before any construction takes place (ante operam).

The Metropolitan Area of Milan is the largest one in Europe and stretches from Como in the North to Pavia in the South and from Novara in the West to Bergamo in the east. This area contains several Natura 2000 sites and other protected areas. However, metro line 4 does not pass remotely close to any of these areas, thus will not damage any of them, nor will it be able to offer opportunities for connecting them. Milan has urban woods, such as Boscoincittà, located to the west of the city. In the Metropolitan City of Milan, green spaces such as parks, forests and wetlands take up 11.9% of the surface, much higher than average for provincial capitals (Hansen et al., 2015[60]).

Metro line 4 does not seem to cross any of these large green areas; moreover, it would run underneath them if this had been the case. However, this means that areas around stations will not offer an opportunity to connect large green areas to each other. The orientation of the metro could offer some opportunity for small green corridors inside the city, which would be beneficial for adaptation to climate risk. However, the metro line has not been specifically designed to do so. Impact on its surroundings during construction may be mitigated, but from the OECD’s analysis, it is not clearly concluded that any opportunities for adaptation have been taken into account.

The Forlanini stop connects to suburban rail lines and is an important node on the metro line. The route of the metro line close to this stop was adjusted to avoid affecting traffic conditions on Viale Forlanini, the main road to Linate Airport on the east side of the city. Instead, construction areas’ locations were shifted to affect some areas of Forlanini Park during the construction phase. While this was a sensible decision regarding traffic flow, it remains disputable whether this was the right decision concerning green infrastructure. While the General Report states that pre-existing structures such as trees have been preserved as much as possible, it does not clearly state to which extent natural elements were affected, not to mention the use of the project to further enhance the natural elements in the park. The stations of the Forlanini stops will only marginally impact the park (Comune di Milano, Consorzio MM 4, SPV M4, 2012[55]).

On the other side of the line, around Via Lorenteggio (a major road leading into the inner city of Milan), between the stations of Segneri and Gelsomini, notable efforts have been planned to use the project for greening the urban area. This is also the case for a small area in the east side of Milan, around Corso Indipendenza, Corso Plebisciti and Viale Argonne. These all consider urban areas with a more spacious configuration and linearly aligned buildings and roads that easily allow for the enhancement and addition of greenery along those areas. Interestingly, the Via Argonne Area is located several hundreds of metres away from the area that the metro line passes underneath. The plan for these areas is to create extended bicycle and pedestrian areas that include the implementation of green areas. The General Report mentions these redevelopment projects being a part of the concept of an ecological corridor, unifying separate parks into one green area.

Additionally, there are GI-related plans for the stations of Frattini, San Babila, Datea, and Tricolore. These stations are part of a public space redevelopment, including bicycle paths, pedestrian areas and paths, and the development and addition of green areas. Moreover, a quarry lake near the San Cristoforo station will be redeveloped as part of the project (Comune di Milano, Consorzio MM 4, SPV M4, 2012[55]).

Thus, a large part of the metro line has been integrated with plans for green elements, either around stations or in other nearby areas. However, for the portion of the line between Tolstoi and Sforza/Policlinico, passing through the inner city and including 9 stations and a significant portion of the length of the line, there are no plans for the inclusion of GI. This is defendable, as the metro line passes under the dense urban fabric that does not easily allow for larger green or ecological corridors. However, these areas are important to consider when considering green infrastructure and adaptation measures. Furthermore, these dense urban areas are particularly vulnerable to the effects of climate change and extreme weather events due to their high population density and often limited capacity for rainwater drainage.

The construction of metro line 4 in Milan is part of the wider Italian strategy to create a modal shift from private to public transport. It can assist in establishing that shift, and therefore not only reduce CO2 emissions but also improve traffic conditions in the city. The line crosses through the city from the southwest to the southeast, including a part located in the inner city of Milan. The line is almost completely underground and thus has limited environmental impacts in the city during the operational phase. Therefore, the environmental assessment and environmental monitoring plan have been mostly focused on mitigating and monitoring environmental impacts during the construction phase.

The line does include elements of green infrastructure. For example, the parts of the line outside the ring road of Milan are accompanied by urban redevelopment projects, adding pedestrian areas, bicycle paths, and enhancement and connection of green areas. This corresponds well with the wider green planning context of Lombardy and the Metropolitan City of Milan, which includes plans for environmental regeneration, increasing quality of life and the possibility for public spaces by reducing car traffic. This case can, for its actions on urban green spaces and its connections to natural areas outside of the inner city, been seen as a national and even international best practice for GI inclusion in urban transport infrastructure. However, there are still some improvements that could be undertaken to provide an even better integration of GI. Notably, in the inner city, which is particularly vulnerable to the effects of climate change, no plans for GI have been found in the literature review conducted for this case study. Moreover, the GI plans that are part of the infrastructure project are not fully connected areas and concern more separate patches of green elements. This is perfectly understandable given Milan's dense urban fabric and is often seen in cases of other cities, too (e.g. Lisbon, where green corridors and urban regeneration projects are located mostly outside of the densest inner-city areas). However, if Milan could improve some of the aspects even more, it could be developed as a major hub and exemplary urban area for green infrastructure.

Some recommendations for improving the integration of GI into this type of project are:

  • More co-ordination is needed between regional and local authorities on how to include GI when planning how to spend funding for centrally planned sustainable mobility and executing plans for modal shifts. This would help establish a modal shift within cities and protect the city from the harmful effects of climate change and extreme weather events.

  • Climate change adaptation, green infrastructure, and nature-based solutions should become part of SUMPs, so they can be properly assessed in the SEA that is performed for each SUMP. This ensures that long-term benefits of GI would also be properly considered and assessed in the SEA if they are integrated into the SUMP.

  • Although a metro line is completely underground, the operational phase should be more explicitly considered in the environmental impact study, with more emphasis on the infrastructure’s capacity to adapt to climate change. This could even promote GI projects such as Milan's M4 – a full assessment of environmental impacts, including positive impacts, would show that a project such as this one, with urban greenery integrated into the project scope, offers long-term environmental benefits.

In Italy, over 70% of the total population lives in urban areas – and this figure is projected to grow to over 80% by 2050 (CCMC, 2021[61]) (Fondazione per lo Sviluppo Sostenibile, n.d.[62]). Climate impacts are particularly acute in urban areas, as Italy displays one of the highest percentages of sealed surface (i.e. 7.1%) in the EU (Di Pirro et al., 2022[63]). This, combined with highly fragmented urban-wildland interfaces, challenges the connectivity across green spaces (Di Pirro et al., 2022[63]) and exposes the urban population to a higher risk of flooding and to extreme heat. In southern regions, in particular, heatwaves pose increasing challenges during the warm summer months. Under climate change, both average temperatures and the frequency and duration of heat extremes are projected to grow substantially in the coming decades, with heatwaves becoming 35% more frequent under a 2°C warming scenario and 80% more frequent under a 4°C scenario (CCMC, 2021[61]). Due to climate change, in recent years, the region of Puglia reported significant heat extremes and climate-related hazards, which have been characterised by higher-than-usual frequency and duration (Climate ADAPT, 2014[64]). Under climate warming, impacts caused by warmer and drier conditions in the region are only expected to increase (Climate ADAPT, 2014[64]).

An increasing number of Italian cities is using urban regeneration as a way to enhance the environmental and climate sustainability of urban areas. For example, the City of Bologna has undertaken a project to green the inner urban area and enhance its adaptation to climate change (Climate ADAPT, 2016[65]). In the City of Milan, the regeneration of the Porta Nuova district – one of the largest urban regeneration projects in Europe – has transformed a former industrial and railway area into a pedestrian green neighbourhood, which now includes two “vertical forest” skyscrapers and Milan’s third largest park (the “Tree Library”, i.e. “Biblioteca degli Alberi”). Several green roof projects are also being developed in the city (Clever Cities, 2021[66]). The City of Torino is also heavily experimenting with various GI and NbS projects including community gardens, urban farms, green roofs and walls (Oppla, n.d.[67]) (ProGIreg, n.d.[68]).

The development of green infrastructures in Italy relies on the favourable conditions produced by the extensive work already done on ecological networks (reti ecologiche) – which include the Natura 2000 sites, parks and other protected natural areas – as well as by the innovative initiatives developed by many regions, provinces and municipalities to protect and enhance the assets of their respective territories (Fondazione per lo Sviluppo Sostenibile, n.d.[62]). Ecological networks are present in almost all Italian Provinces, scattered throughout a high number of municipalities (Fondazione per lo Sviluppo Sostenibile, n.d.[62]). The development of urban green infrastructures is also the object of various regulatory instruments, which include the “Norms for the development of urban green areas”, the “Guidelines for the management of urban green areas”, and the Minimum Environmental Criteria (MEC, see Section Minimum Environmental Criteria above) on the management of urban green areas.

A key instrument to support urban regeneration in Italy is the Programma Innovativo Nazionale per la Qualità dell’Abitare (PINQuA). The programme – which falls under the responsibility of the Italian Ministry of Infrastructure and Transport (MIT) – is an innovative national tool through which funds are made available to regions, municipalities as well metropolitan cities to redevelop and enhance the quality of housing, as well as of broader urban areas (BibLusBIM, 2021[69]). Overall, PINQuA prioritises the redevelopment of social housing, the renovation and regeneration of urban quality, the improvement of urban areas’ accessibility and safety, as well as the reduction of housing shortages and the increase in environmental quality. At the same time, PINQuA focuses on public housing interventions with a high strategic impact on the national territory (BibLusBIM, 2021[69]).

In the context of Italy’s post-Covid recovery and resilience plan (i.e. the PNRR), PINQuA has been scaled up to support the 14 Italian metropolitan cities to become more liveable and greener (Governo Italiano, 2021[25]). Indeed, these cities are increasingly exposed to social and environmental challenges such as air pollution, climate change impacts, as well as housing deficit and inequality, with serious consequences on the well-being and health of citizens (i.e. almost 21 million people). Overall, PNRR funding – which allocates 37.5% of its funds to the achievement of climate and environmental goals – aims to contribute to solve these challenges – addressing urban issues such as biodiversity loss, low air quality, excessive soil use, and growing climate risks through the creation of new green spaces (European Commission, 2022[70]). Altogether, these funds aim to improve the liveability of urban areas, enhancing their accessibility, functionality, safety, and environmental sustainability.

The Nodo Verde is one of the 159 projects approved to receive PNRR funding, and one of the 8 flagged as excellence pilot projects (i.e. “progetti pilota ad alto rendimento”) under PINQuA (BibLusBIM, 2021[69]; Ministero delle infrastrutture e dei trasporti (MIT), 2021[71]). The projects have been presented by regional and local authorities – in the case of the Nodo Verde, by the municipality of Bari – and selected by a dedicated cross-ministerial Commission.

The Nodo Verde project aims at the redevelopment of an urban area of almost 160 thousand square meters in the city of Bari, the capital city of Apulia region in southern Italy. By creating a wide pedestrian passage above the railway line, Nodo Verde aims at greening and repurposing the railway station area, while at the same time reconnecting four neighbourhoods that have long been divided by the railway line (i.e. the city centre, Carrassi, San Pasquale, Madonnella) (see Figure 4.6). The project, to be implemented by 2026, entails the development of an artificial hill, or green roof, above the railway station, as well as the creation of two new public parks west of the station, i.e. between the station and Via Quintino Sella (Comune di Bari, 2021[81]). The project also entails the rehabilitation and repurposing of the main square in front of the station and of the disused Caserma Rossani buildings. Overall, Nodo Verde will substantially increase the amount and connectivity of green areas within the city of Bari, creating a green corridor of 2.2 km throughout the city that will include previously existing urban green areas such as the 3-hectare Parco Rossani, Piazza Aldo Moro, and Piazza Umberto (Figure 4.7). The project will also provide new options for urban mobility through the development of new areas for pedestrian and bike mobility and the enhancement of existing railway and public transport connections. Finally, the project entails the development of a community centre, which will be developed in the spaces of the abandoned Caserma Rossani (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]) (RFI - Direzione Stazioni, 2022[83]).

The project aims to generate several benefits simultaneously. By renovating and reconnecting different neighbourhoods of the city, Nodo Verde will improve the liveability of the area and increase the value of neighbouring buildings, providing citizens and travellers with a new recreation area. Besides, the project will contribute to augmenting green spaces that will harbour urban biodiversity and improve air quality (RFI, 2022[85]). Besides, the new green areas will play a key role in reducing the urban heat island (UHI) effect and will contribute to manage excess rainwater and flood risk (RFI, 2022[85]). Addressing these issues is critical as, in recent years, the Apulia region has already suffered significant climate-related hazards, such as severe heatwaves and drought episodes, which are only expected to increase going forward (Climate ADAPT, 2014[64]).

Increasing green public spaces is particularly crucial in the metropolitan area of Bari. Indeed, various human wellbeing indicators in Bari are significantly below the national average (Città Metropolitana di Bari, 2022[86]). For example, in 2019, the amount of urban green space per capita in the metropolitan city of Bari was 9.2 square metres, as compared to an average national value of 33.9 square metres (BES delle Province, 2021[87]). Similarly, in 2019, the ratio of urban parks over the overall developed surface was 0.2% in the metropolitan city of Bari, as compared to a national average of 1.8% (BES delle Province, 2021[87])40.

The Nodo Verde project relies on the collaboration of several stakeholders at different levels of government, as well as from the private sector. Collaboration between the Ministry of Infrastructure and Transport and the Municipality of Bari has been central to this project since 2004, when the two entities signed a memorandum of understanding (Protocollo di Intesa) on the redevelopment of the urban areas adjacent to the railway station and to the port (RFI - Direzione Stazioni, 2022[83]). As the urban redevelopment plans took shape, the Apulia Region, the Metropolitan City of Bari, and various transport stakeholders have been involved in the development of the project (RFI - Direzione Stazioni, 2022[83]). In 2014, an international project idea competition was launched and the Nodo Verde – presented by the architectural firm Studio Fuksas – was selected as the winning proposal (RFI - Direzione Stazioni, 2022[83]). In 2021, a new memorandum of understanding "for the infrastructural enhancement of the Bari railway node and the urban regeneration of the areas railway areas" was signed by the City of Bari, the Apulia Region and a number of transport stakeholders, including Rete Ferroviaria Italiana (RFI), Ferrovie dello Stato Italiane (FSI), FS Sistemi Urbani, and GS Rail (RFI - Direzione Stazioni, 2022[83]), marking the start of the project.

In 2021, the Municipality of Bari submitted the project proposal to the Ministry of Infrastructure and Transport, to apply for PNRR funding under the Programma Innovativo Nazionale per la Qualità Dell’Abitare (PINQuA). Nodo Verde was then selected to be funded as one of the urban regeneration projects (under the PNRR’s Programme on “Southern urban hubs for the development of sustainable mobility”, i.e. Hub urbani del Sud per lo sviluppo della mobilità sostenibile) (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]) (Press Regione Puglia, 2022[88]) (Ministero delle infrastrutture e dei trasporti (MIT), 2021[71]). Overall, the PNRR will provide EUR 143 million to the project, of which 96.6 million allocated to the Municipality of Bari and the remaining amount allocated to Rete Ferroviaria Italiana, which will be the key actor in charge of project implementation (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]) (Comune di Bari, 2021[81]). The works should be concluded by March 2026 (BibLusBIM, 2021[69]). In the meantime, Studio Fuksas has already concluded the requalification of Parco Rossani (inaugurated in March 2022) and it is finalising the redevelopment of the former Caserma Rossani buildings, which will host a library and the Academy of Fine Arts of Bari (Redazione ANSA, 2022[89]) (RFI, 2022[85]).

As mentioned above, the Nodo Verde project falls under Italy’s PINQuA Programme41 (BibLusBIM, 2021[69]; Ministero delle infrastrutture e dei trasporti (MIT), 2021[71]; Ministero delle infrastrutture e dei trasporti (MIT), 2021[90]), which, since 2021, was allocated a financial contribution of PNRR funds to enhance urban regeneration across the peninsula.42 This link between PINQuA and the PNRR contributed to set more stringent criteria for project design and selection, as the allocation of PNRR funds is subject to projects’ compliance with several sustainability and other criteria.

As for all projects funded by the PNRR, a Technical and Economic Feasibility Project (PFTE) assessment has been undertaken. In compliance with the new Ministry of Infrastructure and Transport’s guidelines for the PFTE (see this report’s Section on “The new guidelines for PFTE: the introduction of the Sustainability Report”), a Sustainability Report has been included in the PFTE of the Nodo Verde project. This includes a series of sustainability assessments, including (i) a “Do Not significant Harm” (DNSH) assessment, (ii) an assessment of the project plan’s compliance with national Minimum Environmental Criteria (MEC) (Criteri Ambientali Minimi), and (iii) a preliminary rating by environmental and sustainability protocols like LEED and ENVISION V3 (RFI - Direzione Stazioni, 2022[83]).

In the context of the PNRR, the EU principle of “Do Not significant Harm” (DNSH) (see chapter 2) was explicitly taken into account in project design, as well as in the project selection phase (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]; Ministero delle infrastrutture e dei trasporti (MIT), 2021[71]). The eligibility of projects depended on their compliance with the DNSH in relation to six environmental objectives (i) climate change mitigation, (ii) climate change adaptation, (iii) the sustainable use and protection of water and marine resources, (iv) the transition towards a circular economy, (v) pollution prevention and control, and (vi) the protection and restoration of biodiversity and ecosystems (European Commission, 2021[91]). To verify the project’s compliance with the DNSH principle, a preliminary Special Environmental Assessment was undertaken (RFI, 2022[92]). The assessment shows that the Nodo Verde project will not have a “significant and substantive impact” on any of the six objectives, and that the project will actively contribute to the achievement of the “climate change adaptation” and the “transition towards a circular economy” objectives (RFI, 2022[92]). Moreover, as part of the DNSH analysis, a climate risk and vulnerability assessment was also performed43 to inform the uptake of relevant climate adaptation measures (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]). The evaluation focused on how the project will deal with the climate risks projected to affect the region going forward, which include increases in temperatures, strong winds, and violent storms (RFI, 2022[93]). Building on this assessment, and with a view to building resilience to these risks, the project plan includes various adaptation strategies and solutions, which include NbS elements. For example, indigenous vegetation species will be used, as these have a low irrigation requirement and are more resilient to high temperatures. Similarly, the green roof will contribute to reduce the heat-island effect in the surrounding area, reducing the amount of short-wave radiations reaching the ground surface and cooling the environment through plant transpiration (RFI, 2022[93]).

Besides, as part of the PFTE, an assessment of the project plan’s compliance with minimum environmental criteria (MECs) (see this report’s Section on Green Public Procurement in Italy) was also undertaken to the Nodo Verde project (RFI - Direzione Stazioni, 2022[83]). For each of these criteria, the assessment report highlights the existing requirements, their applicability to the Nodo Verde project, and the project’s conformity with them (RFI, 2022[94]). In particular, three criteria (i.e. “natural and landscape inclusion”, “landscaping of green areas”, “reducing soil consumption and maintaining the permeability of soils”) focus on the green elements that will be included in the project (RFI, 2022[94]).

Finally, the project plan and its sustainability were evaluated using the LEED (Leadership in Energy and Environmental Design) protocol and the ENVISION protocol (RFI - Direzione Stazioni, 2022[83]). The LEED protocol was used to rate the Nodo Verde project by assessing the sustainability of the buildings included in the project in terms of energy and resource consumption, users’ comfort levels, indoor environmental quality, and others (RFI, 2022[85]). The assessment also accounts and values the inclusion of green components in the project, on the basis of various criteria, e.g. focusing on “preserv[ing] existing natural areas and restor[ing] impaired ones to provide habitats and promote biodiversity” and on “minimising the effects on the microclimate and human and natural habitats through the reduction of the heat island effect” (RFI, 2022[95]). In parallel, Nodo Verde’s overall sustainability has been assessed through the ENVISION 3 protocol – i.e. a rating system that evaluates infrastructure projects’ sustainability, taking into account both project characteristics and the long-term impacts on the surrounding communities (RFI, 2022[85]) (Institute for Sustainable Infrastructure, 2015[96]). Among the criteria set out by the ENVISION protocol, those applicable and achievable by Nodo Verde include “Enhance Functional Habitats”, “Evaluate Risks and Resilience”, “Preserve Undeveloped Land, and “Reduce Pesticide and Fertilizer Impacts” (RFI, 2022[97]). Further assessments will be undertaken as the project advances, to assess whether and how the sustainability measures included in the project plan will be implemented in practice (RFI, 2022[95]).

The evaluation of the urban regeneration projects selected to receive PNRR funding under PINQuA relied on seven criteria, which included (i) environmental impact, (ii) social impact, (iii) cultural impact, (iv) urban and territorial impact, economic and financial impact, both in terms of (v) activation of financial resources and (vi) involvement of private actors, and (vii) technological and procedural impact (Table 4.6) (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]).

Compliance with project selection criteria was measured using 33 indicators. The five environmental impact indicators considered in project evaluation included energy sustainability (i.e. the use of renewable energy sources such as solar, aeolian, hydropower, geothermal, biomass) and energy efficiency (i.e. any improvements in the energy class of buildings), as well as considerations on resource use (i.e. share of reused or recycled materials) and origin (i.e. share of locally sourced resources), and environmental remediation (Ministero delle infrastrutture e dei trasporti, 2021[99]) (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]). A number of environmental sustainability considerations were also accounted for through the urban and territorial impact indicators, which assessed the share of uncovered and green urban areas as well as the development of pedestrian and cyclable paths and the connectivity of the project to public transports (Ministero delle infrastrutture e dei trasporti, 2021[99]). These indicators test one of the basic tenets of the PINQuA programme, i.e. avoiding the consumption and/or sealing of new soil (Ministero delle infrastrutture e dei trasporti (MIT), 2022[98]) (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]), (Ministero delle infrastrutture e dei trasporti, 2021[99]).

Based on these criteria and indicators, the project proposals presented by regional and local authorities – in the case of the Nodo Verde, by the Municipality of Bari – were assessed by a dedicated cross-ministerial High Commission. The Commission included twelve members from MIT, MiC, the Ministry of Interior, as well as the Italian National Association of Municipalities (i.e. Associazione Nazionale Comuni Italiani, ANCI), the Conference of the Regions and Autonomous Provinces (Conferenza delle Regioni e delle Provincie Autonome), and the Presidency of the Council of Ministers (most notably from the Department for Political Economy Planning and Co-ordination and from the Department for Digitalisation (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]). The Ministry of Environment was not involved in this Commission.

The Nodo Verde project was also subject to several other environmental considerations through national, regional, and local regulatory plans. On this basis, in a few instances additional measures had to be undertaken to ensure the project plan’s alignment with the existing regulatory framework. For example, as the Municipality of Bari falls within a zone subject to high transport and industrial pollution, the Nodo Verde project envisages the installation of dust sheets or nets as well as other measures to reduce air pollution during the construction phase, in line with the Regional Air Quality Plan (RFI, 2022[85]). Similarly, the proximity of the project to areas subject to high-flood risk made it mandatory to highlight in the project plan the water discharge points that can help avoid flood risk in the event of extreme precipitation, in line with the Flood Risk Management Plan. In addition, the semi-natural terrain of the artificial hill will contribute to contain flood risk by draining and collecting water through a system of channels and tanks (RFI, 2022[85]) (RFI - Direzione Stazioni, 2022[83]). The excess water collected in these tanks can then be reused for irrigation and firefighting purposes (RFI - Direzione Stazioni, 2022[83]). By increasing connectivity across neighbourhoods and developing pedestrian and cycling mobility options, the project is also aligned with local environmental objectives and requirements (RFI - Direzione Stazioni, 2022[83])., including the goals set out in the Metropolitan City’s Urban Sustainable Mobility Urban Plan (Piano Urbano Mobilità Sostenibile, PUMS).

The Nodo Verde project represents a good example of how urban GI and NbS can contribute to several environmental, social and economic objectives simultaneously, creating value and multiple benefits for the surrounding community. At the same time, the project also shows how – when adequately planned, urban regeneration projects can contribute to enhance the sustainability and resilience of urban areas to the risks and impacts posed by climate change, as well as to broader environmental risks and degradation.

In the Italian context, the PINQuA programme provides a valuable and promising framework to promote urban GI and NbS throughout the national territory, as several sustainability criteria are considered in the project selection phase. Among PINQuA’s eligibility criteria, the particular attention to avoiding development of new land is particularly important, as Italy already displays one of the highest percentages of sealed surface in the EU (Di Pirro et al., 2022[63]). The sustainability requirements introduced by the PNRR – and most notably the DNSH and climate risk and vulnerability assessments – also play an important role, tying funding allocation to specific sustainability requirements, and thus contributing to mainstreaming climate change and environmental sustainability in project design and planning. Indeed, according to the stakeholders involved, while on the one hand the sustainability criteria set out by PINQuA and the PNRR served as a basis for better project selection, on the other they also provided a stimulus towards better project design (Ministero delle infrastrutture e dei trasporti (MIT), 2022[82]). In addition, the Sustainability Report required as part of the Technical and Economic Feasibility Project (PFTE) assessment also plays a key role in mainstreaming GI and NbS in urban regeneration processes. Yet, the absence of the Ministry of Environment – as well as of other stakeholders specialised in environmental and climate issues, such as for example ISPRA – in the cross-ministerial High Commission responsible for selecting the PINQuA projects represents a missed opportunity in Italy’s effort to green the infrastructure sector.

Some recommendations for improving the integration of GI and NbS into urban planning and project implementation are:

  • The criteria set out by PINQuA and the PNRR should be expanded and mainstreamed in broader urban regeneration processes, for example by being integrated in the regional and local regulatory framework, establishing a new standard for urban regeneration projects throughout the national territory. At the same time, resources for urban regeneration projects should be made available for smaller towns and villages as well. Indeed, while these settlements are often those suffering the most from the lack of awareness and resources for GI and NbS financing programmes such as PINQuA and PNRR usually tend to exclude these smaller realities, only contributing to widen the gap between urban and rural areas.

  • GI and NbS should be integrated in a strategic manner in the territory, with a long-term vision for the municipality, the metropolitan area, and the surrounding territory. This includes the planning and implementation of green elements in line with the specific needs and characteristics of each territory, based on existing environmental challenges and climate risks, as well as on existing opportunities and assets. The experience of the City of Torino, which in 2021 approved its Strategic Plan for Green Infrastructure (Piano Strategico dell’Infrastruttura Verde) (Comune di Torino, 2021[100]) as a planning and analytical tool to plan better policies and investments for green infrastructure, represents a best practice that could be replicated in other cities throughout the Country to enhance the framing of GI and NbS as strategic assets. Several elements need to be considered in urban and peri-urban GI planning, including:

    • the net contribution of the planned green infrastructure to the environmental sustainability and climate resilience of the project site and surrounding area, as well as to other socio-economic considerations (e.g. the social context, existing inequalities, etc.);

    • the resilience of the planned infrastructure to future environmental and climate challenges, based on scaled-down climate and environmental scenarios;

    • the connectivity with other green areas and biodiversity hotspots;

    • the multiple ecosystem services, co-benefits, and economic returns likely to result from GI implementation;

    • the need to avoid maladaptation, for example by avoiding using invasive or non-native species that can disrupt local ecosystems or enhance climate risks (e.g. planting flammable vegetation in fire-prone areas).

  • More collaboration is needed between the Ministry of Infrastructure and Transport and the Ministry of Environment. Most notably, environmental and climate experts from the Ministry of Environment, as well as from other specialised governmental and non-governmental agencies, should be closely involved throughout the project’s lifecycle, and most notably during the appraisal and selection stage. This element is particularly critical in light of the need to avoid maladaptation.

  • Enhancing collaboration among public and private actors – including through public-private partnerships (PPPs) is also critical, with a view to scaling up available finance for green infrastructure. The City of Milano’s ForestaMI experience represents a successful example of how engaging private companies can result in successful outcomes (Comune di Milano, n.d.[101]). At the same time, as in most Italian metropolitan cities available surfaces to host GI are missing, co-operation with the private sector can offer new opportunities to make space for nature, e.g. by greening existing grey infrastructure (e.g. through green roofs) or de-sealing currently sealed surfaces.

Dams represent a key infrastructure in Italy. After World War II, the country underwent a period of steep economic growth, which has been accompanied by an intense expansion of infrastructure systems, including the construction of dams to secure Italy’s energy and water supply. Dam development in Italy reached its peak around the 1970s and 1980s (ITCOLD, 2021[102]). Today, the country’s territory hosts more than nine thousand dams44, of which 533 are classified as grandi dighe (i.e. large dams) (CISL FP, 2008[103]). The term “large dams” is conventionally used to refer to all river dams exceeding 15 metres in height or with a reservoir volume exceeding one million cubic metres (Council of Ministers, 1994[104]). Among Italy’s large dams, approximately 73% are in operation, 15% are in their testing phase, while approximately 5% are out of operation for technical reasons and 2% are under construction (CISL FP, 2008[103]) (Facchini, 2018[105]). From an institutional perspective, large dams fall under the competence of the national government,45 while all other dams fall under the competence of the regions (as per Legislative Decree 112/98) (CISL FP, 2008[103]).46 Overall, Italian dams serve several important functions and are recognised as a strategic economic asset at the national level. While 61% of currently existing large dams store water for hydroelectric purposes, 26% are used for irrigation purposes, 12% for potable water supply, and less than 2% for industrial purposes (Rosso, 2017[106]). In most cases, dams also contribute to mitigating the risk of flooding in the occurrence of extreme precipitation (CISL FP, 2008[103]) (Facchini, 2018[105]).

While dams deliver important services, they also bring about some key challenges in relation to their environmental impacts, their management requirements, and their overall resilience to climate and environmental changes. Dams can have negative impacts on biodiversity, biophysical processes, and ecosystem services (Encyclopedia of the Environment, 2019[107]). Most of these impacts usually occur downstream, though some impacts also affect the upstream stretch of rivers, as well as the very area where the dam is located. One of the key environmental impacts of dams is the alteration of the balance between the inflow and outflow of sediments (CISL FP, 2008[103]) (Encyclopedia of the Environment, 2019[107]). Indeed, as they physically alter the natural flow of watercourses and create an artificial basin characterised by low currents, dams capture sediment, leading to the creation of an area with high sediment concentrations (Encyclopedia of the Environment, 2019[107]) (CISL FP, 2008[103]). Overall, approximately 70-90% of the sediments of rivers feeding into dams is normally retained by these infrastructures (Encyclopedia of the Environment, 2019[107]). This can lead to severe ecological problems downstream (CISL FP, 2008[103]) (Encyclopedia of the Environment, 2019[107]), with impacts on biodiversity and ecosystems (e.g. impacts on both flora and fauna) (Encyclopedia of the Environment, 2019[107]) (CISL FP, 2008[103]). In addition, by capturing large shares of sediment, dams also limit the transportation of valuable nutrients downstream, thus affecting the fertility of watercourses, as well as soil quality (Encyclopedia of the Environment, 2019[107]). Besides, the accumulation of sediments in reservoirs also affects the biophysical dynamics of the riverbed downstream, favouring both riverine and coastal erosion (CISL FP, 2008[103]). The alteration of water and sediment flows can also affect the turbidity of watercourses – on which certain species rely to hide from their predators (Encyclopedia of the Environment, 2019[107]). Furthermore, dams affect the distribution of water in watercourses significantly reducing the amounts of water available downstream, with impacts on ecosystems as well as on the communities that rely on them. Dams also constitute a barrier for fish species that need to travel upstream for reproduction, which can have significant impacts on the size of their population, with consequences on the whole ecosystem balance. Finally, through the alteration of geological processes, in some cases dams can also cause geological instability. Overall, while significant, the environmental impacts of dams on watercourses largely depend upon a number of factors, e.g. the dam’s height and width, its location, the underlying ecological dynamics of the river and the surrounding environment, the implementation of mitigating measures, etc. (Encyclopedia of the Environment, 2019[107]).

In addition to environmental considerations, the maintenance of dams is another particularly crucial challenge (CISL FP, 2008[103]). Dams demand constant oversight and the implementation of specific maintenance interventions to operate safely and avoid dam failure (CISL FP, 2008[103]). These interventions usually require significant and continuous resources as well as specific technical competences. Dam oversight and maintenance in Italy is particularly critical as the average age of these infrastructure in Italy exceeds 60 years (ITCOLD, 2018[108]). Today, dam maintenance is included in Italy’s strategy to optimise environmental resources, as per Legislative Decrees 152/99 and 152/2006.

Climate change has had an increasingly important impact on the operation and sustainability of dams in Italy. Floods and droughts, which are both fuelled by climate change, can severely disrupt dam operations, and cause cascading damages and harm to the environment and communities downstream of their operations. Integrating resilience in dam design and maintenance is thus crucial to avoid negative impacts of climate-related extreme weather events. When dams are resilient themselves, they can also enhance resilience of their surrounding areas. For example, by storing and regulating water flows, dams can help reduce flood and drought risk, as proven for example during the intense drought that hit Italy in summer 2022 and that brought various regions to declare the state of emergency. Yet, today, 60% of the artificial basins created by Italy’s large dams have a surface area of less than 100 km2 (CISL FP, 2008[103]). This, combined with the particular orography of the Italian territory, exposes the existing reservoirs – both large dams and regular ones –, to highly variable water loads (CISL FP, 2008[103]). For example, in the Emilia Romagna region, climate-related extreme events are projected to increase soil erosion, with significant impacts on dams’ volume capacity for freshwater storage (with cascading impacts on drinking water supply, agriculture, and other sectors), as well as for hydroelectricity production (Regione Emilia Romagna, 2019[109]) (ARPAE Emila Romagna, 2013[110]).

Overall, in the past decades, the socio-economic and environmental costs entailed by dam construction have become a growing concern among the Italian population, which has started demanding for ex ante assessments that would take into account the costs (including environmental ones) and benefits of the construction of these infrastructures (ITCOLD, 2021[102]). Public demand for such types of assessments equally applies to the construction of new “large dams”, as well as to the management of the existing ones (ITCOLD, 2021[102]).

Built between 1974 and 1982, the Ridracoli dam is an artificial dam of the Bidente River and of the Celluzze stream in the Emilia Romagna region. The artificial basin of Ridracoli is located in the municipality of Bagno di Romagna, in the Romagna Apennines (in the province of Forlì-Cesena) at an altitude of 557 metres above sea level (Ridracoli, n.d.[111]). Overall, the lake covers almost 5 kilometres, partially falling under the territory of the Casentinesi Forests, Monte Falterona and Campigna National Park – which is part of the Natura 2000 network. (IDRO, n.d.[112]) (Ridracoli, n.d.[111]) (ARPAE Emilia Romagna, 2016[113]). With over 103 metres in height and 432 metres in width at its crest, Ridracoli is labelled as a “large dam” under Italian legislation (IDRO, n.d.[112]) (Romagna Acque - Società delle Fonti, 2007[114]).

The dam reservoir serves several objectives at once. It (i) supplies freshwater in the region, thus easing the pressure on groundwater resources; (ii) produces hydroelectric energy; (iii) regulates the flow of the Bidente River, significantly reducing flood risk; and (iv) contains land subsidence processes by reducing groundwater extraction.47 The artificial basin and the requalification of the surrounding area have also provided other indirect socio-economic benefits, creating employment, business, leisure, and environmental education opportunities (Romagna Acque - Società delle Fonti, 2007[114]) (ITCOLD, 2021[102]). The construction of the dam, along with some dedicated financial resources made available by Romagna Acque, have significantly contributed to contrast the marginalization and depopulation of the area (Romagna Acque - Società delle Fonti, 2007[114]) (ITCOLD, 2021[102]) (ARPAE Emilia Romagna, 2016[115]).

The freshwater supply role of the Ridracoli dam is particularly noteworthy. The artificial reservoir can hold up to 33 billion litres of water (IDRO, n.d.[112]) (Ridracoli, n.d.[111]), which feed into the Romagna Aqueduct (Figure 4.8), an infrastructure that supplies water to several provinces in the Emilia Romagna region (DG Dighe, n.d.[116]). Overall, Ridracoli is estimated to supply water to nearly one million residents (as well as to an estimated 50 million tourists every year) across over 50 municipalities in the Romagna Riviera and the neighbouring plains, including to major cities such as Rimini, Riccione, Cattolica, Milano Marittima and Cesenatico, among others (Ridracoli, n.d.[111]) (ITCOLD, 2021[102]) (ARPAE Emilia Romagna, 2017[117]). With approximately 50% of the Romagna area depending on Ridracoli for freshwater supply, the dam represents thus a strategic asset in the region (Conti, 2022[118]) (ARPAE Emilia Romagna, 2016[115]). This role is particularly critical during periods of drought, as proven for example during the 2022 summer, when the dam has ensured effective water supply in spite of the severe drought conditions affecting the region (Luongo, 2022[119]) (Redazione, 2017[120]) (ARPAE Emilia Romagna, 2017[117]).

From an institutional perspective, the key actors involved in the management of the Ridracoli dam include the regional and provincial government, Basin Authorities (Autorità di Bacino), as well as the Regional Environmental Protection Agency (ARPAE). Municipalities and Mountain Communities (Comunità Montane), as well as business and the civil society organisations (e.g. WWF, Confindustria, etc.), also regularly take part in specific planning or consultation processes (Regione Emilia Romagna, 2021[121]). The Ridracoli dam is operated by Romagna Acque Società delle Fonti S.p.A (henceforth Romagna Acque).

From a regulatory perspective, the key tools for water management are the River Basin Management Plan and the Water Protection Plan. The River Basin Management Plan (Piano di Gestione delle Acque, PGA), adopted by the Northern Apennines River Basin District (which includes the Ridracoli network), is a strategic and operational tool to guide water bodies’ protection and the planning and monitoring of relevant measures (ARPAE Emilia Romagna, 2016[113]). Emilia Romagna’s PGA foresees several measures, including GI, to protect, enhance and restore ecosystem quality and connectivity (Autorità di bacino distrettuale, 2021[122]). The regional Water Protection Plan (Piano di Tutela delle Acque, PTA) aims to ensure water quality for internal and coastal waters and the long-term sustainability of water supply (Regione Emilia Romagna, 2021[121]) (ARPAE Emilia Romagna, 2021[123]) (Regione Emilia Romagna, 2006[124]) (DG Ambiente Regione Emilia Romagna, n.d.[125]). Emilia Romagna’s PTA encourages the uptake of GI such as for example river renaturation, environmental remediation, as well as a guaranteed minimum water flow (Regione Emilia Romagna, n.d.[126]). The PTA is also closely linked to the strategic environmental evaluation (Vautazione ambientale strategica, VAS), which helps to assess the environmental impact of all PTA measures (Regione Emilia Romagna, 2005[127]). Both the River Basin Management Plan and the Water Protection Plan comply with European Directive 2000/60/EC and the national legislative decree 152/2006.

The Ridracoli dam has been planned in the 1960s, its development precedes many of the environmental regulations and requirements in place today (Romagna Acque - Società delle Fonti, 2007[114]). Yet, environmental considerations have been considered throughout the whole project lifecycle.

During the design and planning phase, an ex ante assessment of the overall environmental impacts of the infrastructure has been performed. This assessment has been subsequently incorporated into the design process (ITCOLD, 2021[102]). The assessment also included an evaluation of the costs and benefits resulting from the development of the infrastructure (ITCOLD, 2021[102]).

During the project selection phase, the selection of a suitable location to host the dam took into account various environmental considerations, in addition to other technical criteria (e.g. water and soil characteristics). Selection criteria included the presence of coppice forests near the reservoir (which would reduce erosion), a contained disruption of the Bidente River flow, as well as the absence of industrial settlements leading to pollution risk in the derivable basins (ITCOLD, 2021[102]) (Romagna Acque - Società delle Fonti, 2007[114]). The location of Ridracoli was selected over to two other locations, as it was estimated to facilitate the fulfilment of the dam’s goals (ITCOLD, 2021[102]). Ridracoli was also considered a less environmentally harmful option as compared to the other solutions considered, which included groundwater extraction and the diversion of the Po River (ITCOLD, 2021[102]).

The monitoring and management of environmental risks and impacts (Box 4.14) are key elements of the management of Ridracoli. Romagna Acque and the ARPAE oversee the monitoring of water and environmental quality, in compliance with EU and national legislation (ARPAE Emilia Romagna, 2016[113]) (ARPAE Emilia Romagna, 2021[123]), which put particular emphasis on water quality monitoring, as well as on the environmental condition of water bodies, on the basis of ecological and chemical assessments.48 The impact of the dam on the river flow is also monitored and carefully managed. Overall, the operations of the Ridracoli dam have a contained impact on the Bidente-Ronco River flow, whose outflow at the river mouth is estimated to be reduced by 15% (Romagna Acque - Società delle Fonti, 2007[114]).

To reduce the environmental impacts observed in the area surrounding the dam, and most notably a major problem of soil erosion that was leading to the silting of the reservoir, as well as to reduced water quality (Regione Emilia-Romagna (DG cura del territorio e dell’ambiente), n.d.[129]), a variety of ecosystem conservation, enhancement and restoration interventions have been realised in the area of the Ridracoli hydrographic basin. Since the 1980s, these interventions have included (i) the reforestation and renaturation of the hill slopes surrounding the dam that had been sealed or damaged, through the replanting of coppice woods, which have contributed to contain soil erosion and restore natural ecosystems on a largely renaturation; and (ii) naturalistic engineering interventions, including hydrogeological interventions (e.g. through hydraulic regulation) and consolidation of the slopes; and (iii) the recovery of ancient forest paths and trails, for the benefit of both tourists and visitors as well as Romagna Acque operators (e.g. for the placement of technical equipment for the control of landslides and rainfall measurements); and (iv) research programmes on environmental protection targeted to the basin area. Altogether, between 1981 and 1995, a total of EUR 4.6 million was mobilised for these interventions. (Romagna Acque - Società delle Fonti, 2007[114]) (ARPAE Emilia Romagna, 2016[115]).

These environmental remediation measures are undertaken by relevant stakeholders (e.g. Romagna Acque, the Ministry of Agricultural and Forestry Policies, the Province of Forlì-Cesena, the Consortium of Reclamation of Central Romagna, etc.) (Romagna Acque - Società delle Fonti, 2007[114]). Romagna Acque is usually closely involved in these interventions, either by undertaking them directly of by financing and supporting them indirectly. Between 1996 to 2008, Romagna Acque set up a special fund to finance the environmental remediation of the areas surrounding the dam. Over little more than a decade, the fund raised a total of EUR 8 million generated through a 3% levy on the water sale revenues (ARPAE Emilia Romagna, 2016[130]).

Since 2008, the levy has been substituted by a regional tariff system, which has been used to set up a scheme of payment-for-ecosystem-services (Regione Emilia-Romagna (DG cura del territorio e dell’ambiente), n.d.[129]) in the area. Using the revenues from the dam’s water tariff, the system remunerates local forest owners that engage in sustainable forest management practices, encouraging more sustainable forest management and compensating local forest owners for the costs incurred in the process (Regione Emilia-Romagna (DG cura del territorio e dell’ambiente), n.d.[129]). The payment amounts to EUR 100/ha, i.e. 3% of the total revenue obtained from the water tariff (Romagna Acque - Società delle Fonti, 2007[114]) (Regione Emilia-Romagna (DG cura del territorio e dell’ambiente), n.d.[129]). As a result of improved forest management, soil erosion has significantly decreased, while water quality and ecosystem services have substantially improved.

The introduction of a series of environmental remediation mechanisms and the setup of the ecosystem payment scheme in the area surrounding the dam has been considered a best practice in dam management in Italy (ITCOLD, 2021[102]), as it has enhanced the reforestation of the hillslope surrounding the dam, thus improving ecosystem services and forest management, while at the same time redistributing the benefits from the assets to the local community (ITCOLD, 2021[102]). The involvement of the local community – most notably local forest owners – has also been considered a good example that could be implemented elsewhere (ITCOLD, 2021[102]). Overall, the interventions implemented at Ridracoli make the asset align with the guidance provided by the World Commission on Dam in its 2000 report (World Commission on Dams, 2000[131]).49

The Ridracoli dam also offers a good example of the advantages of integrating ecosystem services in economic accounting. Indeed, while on the one hand doing so benefits environmental protection, at the same time enhanced environmental quality represents an economic investment that benefits asset operators and managers, as well as the broader territory. Such investment can be measured, for instance, in terms of water quality gains and energy savings (ITCOLD, 2021[102]).

The Ridracoli dam also highlights the importance of considering climate risks and environmental challenges to infrastructure assets as early as possible in an asset’s lifecycle – to minimise risks and impacts. This means for example undertaking climate and environmental risk assessments at different stages of the asset life (i.e. from project design to dismissal), building on scaled-down climate and environmental scenarios that adequately represent existing and projected hazard at the local level. In the case of dams, it is particularly critical to consider the challenges posed by changing precipitation patterns. Indeed, on the one hand, the increase in the frequency and intensity of extreme precipitation events pose the challenge of managing excess amounts of water (for which existing dams might not be ready) and increases the risk of hillslope erosion and of landslides, in the most extreme cases challenging the stability of the infrastructure. On the other hand, the decrease in the overall volumes of precipitation throughout the year can pose significant challenges to the ability of existing and planned dams to successfully deliver their services. While the efforts undertaken to enhance the resilience of the Ridracoli dam to water scarcity have proven rather successful in recent years, continued (and if necessary increased) efforts are needed, given the dam’s strategic importance for water supply in the region.

It is also critical to ensure that dam infrastructure minimises ecosystem disruption. This means undertaking environmental impact assessments with a focus on all the ecosystems potentially affected by the asset – which, in many cases, might go far beyond the site where the dam is located. Environmental impact assessments should primarily focus on the ecological conditions of the water course(s) affected by the dam (Regione Emilia Romagna, 2019[109]), focusing on the artificial basin as well as on downstream and upstream impacts. Environmental impact assessments should be carried out at different stages of the asset life (i.e. from project design to dismissal) and be accompanied by measures to ensure the remediation or containment of any unavoidable impacts, with a particular focus on (i) ensuring an adequate water flow throughout the year and (ii) anticipating and minimising potential conflicts for water resource allocation (Regione Emilia Romagna, 2019[109]). As the size of the asset is not necessarily proportional to its potential impacts, it is crucial to undertake environmental impact assessments for dams of all sizes – without neglecting smaller dams, whose operation is often supported by a lower amount of information (CISL FP, 2008[103]).

Green infrastructures offer valuable tools to address, at least partially the harmful environmental impacts of dams. For example, the re-greening of the Ridracoli dam hillslope represents a good example of how GI can play a role in compensating the environmental impacts of grey infrastructure and in enhancing their resilience to climate change, while at the same time creating multiple other benefits for the surrounding ecosystems, communities, and economies. At Ridracoli, the forest environment is integrated with the ecosystems created by the presence of the dam, creating a complex dam-forest environment.

References

[134] Agenzia per la coesione territoriale (n.d.), Agenda 2030 per lo sviluppo sostenibile, https://www.agenziacoesione.gov.it/comunicazione/agenda-2030-per-lo-sviluppo-sostenibile/#:~:text=La%20Strategia%20Nazionale%20di%20Sviluppo%20Sostenibile%202017%2D2030%20si%20configura,esempio%2C%20la%20perdita%20di%20biodiversit%C3%A0%2C (accessed on  September 2022).

[5] Alleanza Italiana per lo Sviluppo Sostenbile (ASviS) (2022), “Infrastrutture Verdi Urbane e Periurbane”, Position Paper 2022 - Gruppo di Lavoro sul Goal 11, https://asvis.it/public/asvis2/files/Pubblicazioni/PositionPaperGdl11_InfrastruttureVerdi_FINAL.pdf.

[110] ARPAE Emila Romagna (2013), Il cambiamento climatico e la pianificazione idrica.

[123] ARPAE Emilia Romagna (2021), Normativa sulle acque, https://www.arpae.it/it/temi-ambientali/acqua/normativa.

[117] ARPAE Emilia Romagna (2017), Idropotabile, Come Fronteggiare La Siccità.

[113] ARPAE Emilia Romagna (2016), Direzione Tecnica. Approvazione schema di Protocollo d’intesa con Regione Emilia-Romagna e Romagna Acque Società delle Fonti S.p.A. per un approfondimento di indagine nell’invaso di Ridracoli (FC), https://apps.arpae.it/REST//media/61b4529c8a5d9adbe4fe04d9.

[130] ARPAE Emilia Romagna (2016), La Valorizzazione Economica Del Capitale Naturale.

[115] ARPAE Emilia Romagna (2016), Romagna Acque - il “grossista” per la gestione pubblica.

[7] Autorita’ di Bacino del Fiume Po (March 2016), Piano di gestione del distretto idrografico del fiume Po (riesame e aggiornamento al 2015) - Programma di misure, https://pianoacque.adbpo.it/piano-di-gestione-2015/.

[122] Autorità di bacino distrettuale (2021), Il Piano 2021-2027, https://www.appenninosettentrionale.it/itc/?page_id=2904.

[87] BES delle Province (2021), Bari Il Benessere Equo E Sostenibile Nella Città Metropolitana Di, http://www.besdelleprovince.it/fileadmin/grpmnt/1017/PDF_BES/BES_2021_FASCICOLO_BARI.pdf (accessed on 22 November 2022).

[69] BibLusBIM (2021), PINQuA: projects for the quality of living put to the test of innovation, https://bim.acca.it/pinqua-programma-innovativo-nazionale-qualita-abitare/ (accessed on 28 October 2022).

[61] CCMC (2021), G20 Climate Risk Atlas: Italy.

[128] Chahoud, A. et al. (n.d.), Numerical Modelling Tools for Water Crisis Prediction and Management.

[103] CISL FP (2008), Registro italiano dighe: Ricostituzione in ente pubblico.

[26] CITE (2021), Piano per la Transizione Ecologica, MiTE, https://asvis.it/public/asvis2/files/Eventi_ASviS/PTE_definitivo.pdf.

[86] Città Metropolitana di Bari (2022), Verde metropolitano, https://dait.interno.gov.it/documenti/pui_2_-_bari.pdf (accessed on 22 November 2022).

[58] Citta’ Metropolitana di Milano (April 2021), Piano Urbano della Mobilita’ Sostenibile (PUMS), https://www.cittametropolitana.mi.it/PUMS/ (accessed on  January 2023).

[66] Clever Cities (2021), Milan’s co-design pathway to spread green roofs and walls throughout the city, https://clevercities.eu/news/?c=search&uid=g4LKeo8d.

[78] Climate ADAPT (2022), The economics of managing heavy rains and stormwater in Copenhagen – The Cloudburst Management Plan — English, https://climate-adapt.eea.europa.eu/en/metadata/case-studies/the-economics-of-managing-heavy-rains-and-stormwater-in-copenhagen-2013-the-cloudburst-management-plan (accessed on 10 October 2022).

[65] Climate ADAPT (2016), GAIA - Green Area Inner-city Agreement to finance tree planting in Bologna, https://climate-adapt.eea.europa.eu/en/metadata/case-studies/gaia-green-area-inner-city-agreement-to-finance-tree-planting-in-bologna.

[64] Climate ADAPT (2014), Adapting to climate change - Integrated water and coastal management in Puglia, Italy, https://climate-adapt.eea.europa.eu/en/metadata/case-studies/adapting-to-climate-change-integrated-water-and-coastal-management-in-puglia-italy/#challenges_anchor.

[72] CMCC (2021), G20 Climate Risk Atlas: Italy, https://www.g20climaterisks.org/italy/.

[80] CodeBlue (2022), Sponge Cities Beating Urban Heat In China - CodeBlue, https://codeblue.galencentre.org/2022/08/03/sponge-cities-beating-urban-heat-in-china/ (accessed on 10 October 2022).

[14] Comitato Capitale Naturale (2021), Quarto rapporto sullo stato del capitale naturale in Italia.

[4] Comitato per lo sviluppo del verde pubblico (2017), Linee guida per la gestione del verde urbano e prime indicazioni per una pianificazione sostenibile, Ministero dell’Ambiente e della Tutela del Mare e del Territorio (MATTM), https://www.mase.gov.it/sites/default/files/archivio/allegati/comitato%20verde%20pubblico/linee_guida_finale_25_maggio_17.pdf.

[81] Comune di Bari (2021), Progetto “Nodo verde” finanziato per 100 milioni di euro dal bando ministeriale “Qualità dell’abitare”, finanziamenti anche per San Pio e Santa Rita, https://www.comune.bari.it/-/progetto-nodo-verde-finanziato-per-100-milioni-di-euro-dal-bando-ministeriale-qualita-dell-abitare-finanziamenti-anche-per-san-pio-e-santa-rita (accessed on 25 October 2022).

[101] Comune di Milano (n.d.), Verde. Con Forestami avanza piano per 3 milioni di alberi entro il 2030, https://www.comune.milano.it/-/verde.-con-forestami-avanza-piano-per-3-milioni-di-alberi-entro-il-2030.

[55] Comune di Milano, Consorzio MM 4, SPV M4 (2012), Studio di Fattibilita’ Ambientale - Linea Metropolitana 4 di Milano.

[59] Comune di Milano, Consorzio MM4, SPV M4 (2012), Piano di Monitoraggio Ambientale (P.M.A) - Relazione generale. Linea Metropolitana 4 di Milano.

[57] Comune di Milano, Consorzio MM4, SPV M4 (2012), Progetto Definitivo - Linea Metropolitana M4 di Milano (Lorenteggio - Linate).

[100] Comune di Torino (2021), Il PIano Strategico dell’INfrastruttura Verde Torinese, http://www.comune.torino.it/verdepubblico/il-verde-a-torino/piano-infrastruttura-verde/#:~:text=Si%20tratta%20di%20un%20documento,forza%20e%20le%20debolezza%2C%20valutando.

[118] Conti, E. (2022), Emergenza siccità in Romagna, la diga di Ridracoli regge: acqua potabile per tutta l’estate, https://corrieredibologna.corriere.it/bologna/cronaca/22_giugno_21/emergenza-siccita-romagna-diga-ridracoli-regge-acqua-potabile-tutta-l-estate-8486b922-f166-11ec-9429-9efbe13b35d4.shtml (accessed on 19 October 2022).

[104] Council of Ministers (1994), Law 584/1994.

[125] DG Ambiente Regione Emilia Romagna (n.d.), Piano di tutela delle acque, https://ambiente.regione.emilia-romagna.it/it/acque/temi/piano-di-tutela-delle-acque (accessed on 20 October 2022).

[116] DG Dighe (n.d.), Diga di Ridracoli (Forlì), https://dgdighe.mit.gov.it/categoria/articolo/_dighe_di_rilievo/diga_di_ridracoli (accessed on 19 October 2022).

[63] Di Pirro, E. et al. (2022), “Facing Multiple Environmental Challenges through Maximizing the Co-Benefits of Nature-Based Solutions at a National Scale in Italy”, Forests, Vol. 13/4, https://doi.org/10.3390/f13040548.

[107] Encyclopedia of the Environment (2019), How to reconcile dams and sediment transport?, https://www.encyclopedie-environnement.org/en/water/how-reconcile-dams-sediment-transport/ (accessed on 18 October 2022).

[70] European Commission (2022), 2022 Country Report - Italy.

[91] European Commission (2021), ’Do no significant harm’ Technical Guidance by the Commission Recovery and Resilience Facility, https://ec.europa.eu/info/sites/default/files/2021_02_18_epc_do_not_significant_harm_-technical_guidance_by_the_commission.pdf (accessed on 5 December 2022).

[34] European Commission (2013), Guidance on Integrating Climate Change and Biodiversity into Environmental Impact Assessment, Publications Office of the European Union, https://doi.org/10.2779/11735.

[29] European Commission (2013), Guidance on Integrating Climate Change and Biodiversity into Strategic Environmental Assessment, Publications Office of the European Union, https://doi.org/10.2779/11869.

[43] European Commission (2008), “Public procurement for a better environment”, http://eurlex.europa.eu/LexUriServ/LexUriServ.do?uri=COM:2008:0400:FIN:EN:PDF.

[54] European Environment Agency (EEA) (n.d.), Natura 2000 End 2021 - Shapefile, https://www.eea.europa.eu/data-and-maps/data/natura-14/natura-2000-spatial-data/natura-2000-shapefile-1 (accessed on 7 February 2023).

[135] Eurostat (2013), Environmental taxes - a statistical guide, Publication Office of the European Union, https://doi.org/10.2785/47492.

[105] Facchini, D. (2018), “L’Italia ai piedi delle grandi dighe. Tra vetustà, sicurezza e futuro”, https://altreconomia.it/futuro-grandi-dighe/ (accessed on 11 October 2022).

[42] Fadelli, A. and M. Fava (October 2021), , Il recovery plan italiano: priorita’ e implementazione, https://www.deutsche-bank.it/news/detail/CIO-cio-special-il-recovery-plan-italiano-priorita-e-implementazione?language_id=1 (accessed on  March 2022).

[62] Fondazione per lo Sviluppo Sostenibile (n.d.), Infrastrutture verdi: Aumentare la resilienza dei territori, combattere il cambiamento climatico, http://www.comitatoscientifico.org/temi%20CG/territorio/infrastruttureverdi.htm (accessed on 19 September 2022).

[132] Formez PA (2020), Azione di sistema - monitoraggio e verifica dell’attuazione delle misure di semplificazione della legge n.124 del 2015, degli interventi previsti nell’Agenda per la semplificazione e dell’operativita’ degli sportelli, http://focus.formez.it/sites/all/files/74_report_politiche_norme_rigenerazione_urbana_-marzo_2020.pdf (accessed on  2022).

[76] Frantzeskaki, N. and T. McPhearson (2022), “Mainstream Nature-Based Solutions for Urban Climate Resilience”, BioScience, Vol. 72/2, pp. 113-115, https://doi.org/10.1093/biosci/biab105.

[31] Geneletti, D. (ed.) (2016), Promoting Nature-Based Solutions for Climate Adaptation in Cities through Impact Assessment, Edward Elgar Publishing, https://doi.org/10.4337/9781783478996.00025.

[25] Governo Italiano (2021), Piano Nazionale di Ripresa e Resilienza - PNRR.

[28] Governo Italiano (2006), “Decreto Legilsativo del 3 aprile 2006, n. 152”, Norme in materia ambientale, https://www.gazzettaufficiale.it/dettaglio/codici/materiaAmbientale (accessed on  September 2022).

[60] Hansen, R. et al. (2015), Report of case study city portraits: Appendix Green Surge study on urban green infrastructure planning and governance in 20 European case studies. [Project Green Surge - No. EU FP7].

[49] Hasanbeigi, A., R. Becqué and C. Springer (2019), Curbing Carbon from Consumption: the role fo green public procurement, Global Efficiency Intelligence.

[6] Henriette, J., M. Neubert and C. Marrs (eds.) (2019), Green Infrastructure Handbook: Conceptual and theoretical background, terms and definition, Interreg, https://www.interreg-central.eu/Content.Node/MaGICLandscapes-Green-Infrastructure-Handbook.pdf.

[112] IDRO (n.d.), La diga, http://www.ecomuseoridracoli.it/diga/#:~:text=La%20diga%20%C3%A8%20alta%20103,montagna%20per%20circa%205%20km. (accessed on 11 October 2022).

[37] Il Dipartimento per la programmazione e il coordinamento della politica economica, (DIPE) (7 December 2021), Direttiva del Presidente del Consiglio, Mario Draghi, in materia di Investimenti pubblici sostenibili, https://www.programmazioneeconomica.gov.it/direttiva-del-presidente-del-consiglio-mario-draghi-in-materia-di-investimenti-pubblici-sostenibili/.

[96] Institute for Sustainable Infrastructure (2015), ENVISION, https://research.gsd.harvard.edu/zofnass/files/2015/06/Envision-Manual_2015_red.pdf (accessed on 8 December 2022).

[79] Istituto nazionale di statistica (ISTAT) (2022), Rilevazione dati meteo-climatici ed idrologici, https://www.istat.it/it/archivio/202875#:~:text=Dati%20meteoclimatici%20ed%20idrologici%20%C3%A8,rilevate%20presso%20Enti%20Gestori%20(unit%C3%A0.

[22] Istituto Superiore per la Protezione e la Ricerca Ambientale (ISPRA) (n.d.), Quadro Normativo e Politiche di Adattamento - Citta’ e Regioni Italiane, https://cambiamenticlimatici.isprambiente.it/index.php/quadro-normativo-e-politiche-di-adattamento/citta-e-regioni-italiane/ (accessed on  January 2023).

[19] Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA) (2019), Strategie e Piani di Adattamento ai Cambiamenti Climatici.

[32] Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA) (n.d.), “Normativa Vigente in materia di VIA”, VIA e D.Lgs. 152/2006 e s.m.i. (Testo Unico dell’Ambiente o Codice dell’ambiente), https://www.isprambiente.gov.it/it/attivita/autorizzazioni-e-valutazioni-ambientali/valutazione-di-impatto-ambientale-via/normativa-vigente-in-materia-di-via-1 (accessed on  September 2022).

[13] Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA) (n.d.), “Rete Ecologica e Pianificazione Territoriale”, Le procedure normative, https://www.isprambiente.gov.it/it/progetti/cartella-progetti-in-corso/biodiversita-1/reti-ecologiche-e-pianificazione-territoriale/reti-ecologiche-a-scala-locale-apat-2003/strumenti-per-la-progettazione-di-una-rete-ecologica (accessed on  September 2022).

[10] Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA) (n.d.), Reti Ecologiche e Pianificazione del Territorio e del Paesaggio, https://www.isprambiente.gov.it/it/progetti/cartella-progetti-in-corso/biodiversita-1/reti-ecologiche-e-pianificazione-territoriale (accessed on  September 2022).

[8] Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA) (n.d.), “Valutazione Ambientale Strategica (VAS)”, ISPRA e la VAS. Le attivita’ di ISPRA in materia di VAS, https://www.isprambiente.gov.it/it/attivita/autorizzazioni-e-valutazioni-ambientali/valutazione-ambientale-strategica-vas/ispra-e-la-vas (accessed on  September 2022).

[27] Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA) (n.d.), Valutazione Ambientale Strategica (VAS), https://www.isprambiente.gov.it/it/attivita/autorizzazioni-e-valutazioni-ambientali/valutazione-ambientale-strategica-vas (accessed on  September 2022).

[102] ITCOLD (2021), Dighe e Territorio - Benefici e problemi associati alla presenza dei serbatoi artificiali sul territorio: indagine socio-economica e ambientale sul rapporto “Diga-Territorio”.

[108] ITCOLD (2018), Dighe e Territorio, https://www.aeit.it/aeit/mail_attach/AEIT_lg_all20180813092031.pdf (accessed on 11 October 2022).

[53] Iyer-Raniga, U. and M. Finamore (2021), “Green public procurement: learnings from Pesaro city, Italy”, IOP Conference Series: Earth and Environmental Science, Vol. 855, https://iopscience.iop.org/article/10.1088/1755-1315/855/1/012006/meta.

[21] Legambiente (2022), Il clima e’ gia’ cambiato - gli impatti di siccita’ e caldo estemo sulle citta’, i territori e le persone.

[20] Legambiente (2021), Rapporto Citta’ Clima 2021 - “il clima e’ gia’ cambiato”, https://www.legambiente.it/rapporti/rapporto-cittaclima/.

[119] Luongo, L. (2022), Romagna: Siccità, problema per ora scongiurato grazie a diga Ridracoli, 2022, https://www.teleromagna24.it/attualit%C3%A0/romagna-siccita-problema-per-ora-scongiurato-grazie-a-diga-ridracoli/2022/6 (accessed on 19 October 2022).

[44] Mačiulytė, E. and E. Durieux (2020), Public Procurement of Nature-based Solutions: addressing barriers to the procurement of urban NbS - case studies and recommendations, Publication office of the European Union, https://doi.org/10.2777/561021.

[2] Martin, J. et al. (2021), “Catalyzing Innovation: Governance Enablers of Nature-Based Solutions”, Sustainability, Vol. 13/4, p. 1971, https://doi.org/10.3390/su13041971.

[15] Ministero della Transizione Ecologica (MiTE) (2022), Strategia Nazionale Biodiversita’ 2030, MiTE.

[52] Ministero della Transizione Ecologica (MiTE) (June 2022), Strategia nazionale per l’economia circolare, http://www.mite.gov.it/.

[11] Ministero dell’Ambiente e della Protezione del Territorio e del Mare (MATTM) (December 2013), Le infrastrutture verdi e i servizi ecosistemici in Italia come strumento per le politiche ambientali e la green economy: potenzialita’, criticita’ e proposte. Conferenza: La Natura dell’Italia.

[45] Ministero dell’Ambiente e della Sicurezza Energetica (MASE) (n.d.), Piano d’Azione Nazionale sul GPP, https://gpp.mite.gov.it/Home/PianoAzioneNazionaleGPP (accessed on  March 2022).

[50] Ministero dell’ambiente e della sicurezza energetica (MASE) (2021), CAM - Criteri Ambientali Minimi, https://gpp.mite.gov.it/Home/Cam (accessed on  November 2022).

[46] Ministero dell’ambiente e della sicurezza energetica (MASE) (2013), Piano d’Azione Nazionale per la Sostenibilita’ Ambientale dei Consumi nel settore della Pubblica Amministrazione (PAN GPP), https://www.mite.gov.it/sites/default/files/archivio/allegati/GPP/all.to_21_PAN_GPP_definitivo_EN.pdf (accessed on  March 2022).

[18] Ministero dell’Ambiente e della Tutela del Territorio e del Mare (MATTM) (2018), Piano Nazionale di Adattamento ai Cambiamenti Climatici, MATTM.

[17] Ministero dell’Ambiente e della Tutela del Territorio e del Mare (MATTM) (2015), Strategia Nazionale di Adattamento ai Cambiamenti Climatici, MATTM.

[16] Ministero dell’Ambiente e della Tutela del Territorio e del Mare (MATTM) (October 2017), Strategia Nazionale per lo Sviluppo Sostenibile, MATTM.

[51] Ministero dell’ambiente e della tutela del territorio e del mare (MATTM) (10 Marzo 2020), Decreto 10 Marzo 2020 - Criteri ambientali minimi per il servizio di gestione del verde pubblico e la fornitra di prodotti per la cura del verde, https://www.gazzettaufficiale.it/eli/id/2020/04/04/20A01904/sg.

[99] Ministero delle infrastrutture e dei trasporti (2021), Modello Pinqua.

[82] Ministero delle infrastrutture e dei trasporti (MIT) (2022), “PINQuA: progetti e prime evidenze”, https://www.mit.gov.it/nfsmitgov/files/media/notizia/2022-04/Rapporto_Pinqua_web.pdf.

[98] Ministero delle infrastrutture e dei trasporti (MIT) (2022), Programma innovativo nazionale per la qualita’ dell’abitare.

[90] Ministero delle infrastrutture e dei trasporti (MIT) (2021), Allegato 2 - Proposte Ammesse, https://www.mit.gov.it/nfsmitgov/files/media/notizia/2021-10/elenco%20progetti%20pilota%20finanziati.pdf.

[33] Ministero delle infrastrutture e dei trasporti (MIT) (2021), Linee Guida per la redazione del progetto di fattibilita’ tecnica ed economica da porre a base dell’affidamento di contratti pubblici di lavori del PNRR e del PNC, MIT, https://www.mit.gov.it/nfsmitgov/files/media/notizia/2022-01/1.%20Linee_Guida_PFTE.pdf.

[71] Ministero delle infrastrutture e dei trasporti (MIT) (2021), Pnrr: assegnati 2,8 mld per il programma PinQua sulla qualità dell’abitare. Il 40% va al Mezzogiorno, https://www.mit.gov.it/comunicazione/news/pnrr-assegnati-28-mld-per-il-programma-pinqua-sulla-qualita-dellabitare-il-40-va (accessed on 21 November 2022).

[36] Ministero delle infrastrutture e dei trasporti (MIT) (21 January 2022), Quadro programmatico, scelte e valutazione. Verso la definizione di un framework integrato per la realizzazione di infrastrutture resilienti e sostenibili, Ministero delle infrastrutture e dei trasporti (MIT), https://www.mit.gov.it/comunicazione/news/opere-pubbliche-nuovi-metodi-per-la-programmazione-e-la-valutazione-dei-progetti.

[24] Ministero delle politiche agricole, alimentari e forestali (Mipaaf) (2021), Il Piano Strategico della PAC 2023-27 (PSP), https://www.reterurale.it/PAC_2023_27/PianoStrategicoNazionale.

[35] Ministero dell’Economia e delle Finanze (MEF) (2021), Guida Operativa per il rispetto del principio di non arrecare danno significativo all’ambiente, Governo Italiano.

[23] Neves, A. et al. (2016), The Covenant of Mayors for Climate and Energy Reporting Guidelines, Publications Office of the European Union, https://doi.org/10.2790/586693.

[41] OECD (2021), Government at a Glance 2021, OECD Publishing, Paris, https://doi.org/10.1787/1c258f55-en.

[39] OECD (2021), OECD Implementation Hanbook for Quality Infrastructure Investment: supporting a sustainable recovery from the Covid-19 crisis, OECD Publishing, https://www.oecd.org/finance/OECD-Implementation-Handbook-for-Quality-Infrastructure-Investment.htm.

[40] OECD (2021), Scaling up Nature-based Solutions to Tackle Water-related Climate Risks: Insights from Mexico and the United Kingdom, OECD Publishing, Paris, https://doi.org/10.1787/736638c8-en.

[73] OECD (2020), “Nature-based solutions for adapting to water-related climate risks”, OECD Environment Policy Papers, No. 21, OECD Publishing, Paris, https://doi.org/10.1787/2257873d-en.

[47] OECD (2015), Going Green: Best Practices for Sustainable Procurement, OECD Publishing, https://www.oecd.org/gov/ethics/Going_Green_Best_Practices_for_Sustainable_Procurement.pdf.

[1] OECD (Forthcoming), OECD Compendium of Green Infrastructure and Nature-based solutions.

[3] Oppla (n.d.), Milan - NBS for urban regeneration, https://oppla.eu/casestudy/19446 (accessed on  October 2022).

[67] Oppla (n.d.), Mirafiori Sud Living Lab, https://oppla.eu/casestudy/20114 (accessed on 25 October 2022).

[48] Osservatorio Appalti Verdi (2021), “Osservatorio Appalti Verdi - Rapporto 2021”, I numeri del Green Public Procurement in Italia, https://www.legambiente.it/wp-content/uploads/2021/10/Osservatorio-Appalti-Verdi_dossier2021.pdf.

[74] Ozment, S., G. Ellison and B. Jongman (n.d.), Nature-based solutions for disaster risk management, World Bank Group, http://www.naturebasedsolutions.org.

[12] PadovaNET (April 2022), Piano del verde comunale: uno strumento di pianificazione del verde pubblico, https://www.padovanet.it/informazione/piano-del-verde-comunale.

[88] Press Regione Puglia (2022), Maurodinoia: La stazione di Bari Centrale diventa nodo verde urbano e hub per la mobilità e i servizi al cittadino, Press Regione Puglia, https://press.regione.puglia.it/-/maurodinoia-la-stazione-di-bari-centrale-diventa-nodo-verde-urbano-e-hub-per-la-mobilit%C3%A0-e-i-servizi-al-cittadino- (accessed on 27 October 2022).

[68] ProGIreg (n.d.), The Living Lab: Mirafiori Sud, https://progireg.eu/turin/ (accessed on 25 October 2022).

[120] Redazione (2017), Emilia Romagna: Siccità. Bene diga Ridracoli, massima attenzione al fiume Po, TeleRomagna 24, https://www.teleromagna24.it/politica/emilia-romagna-siccita-bene-diga-ridracoli-massima-attenzione-al-fiume-po-video/2017/07/ (accessed on 19 October 2022).

[89] Redazione ANSA (2022), “Parco Rossani, ex Caserma di Bari rivive tra musica e verde”, ANSA, https://www.ansa.it/puglia/notizie/2022/03/20/parco-rossani-ex-caserma-di-bari-rivive-tra-musica-e-verde_7138e744-44dc-412c-8f5c-0869fd6d731d.html (accessed on 22 November 2022).

[121] Regione Emilia Romagna (2021), Piano di Tutela delle Acque, https://ambiente.regione.emilia-romagna.it/it/acque/temi/piano-di-tutela-delle-acque.

[109] Regione Emilia Romagna (2019), Strategia per la mitigazione e l’adattamento della Regione Emilia-Romagna, https://ambiente.regione.emilia-romagna.it/it/cambiamenti-climatici/temi/la-regione-per-il-clima/strategia-regionale-per-i-cambiamenti-climatici/la-regione-per-il-clima-la-strategia-di-mitigazione-e-adattamento-per-i-cambiamenti-climatici.

[124] Regione Emilia Romagna (2006), Strategic contents of policies in the Water Protection Plan of Emilia-Romagna Region, https://ambiente.regione.emilia-romagna.it/it/acque/approfondimenti/documenti/piano-di-tutela-delle-acque/water-protection-plan-strategic-contents-of-policies/piano_tutela_acque_english.pdf.

[127] Regione Emilia Romagna (2005), Piano di Tutela delle Acque (VALSAT), https://ambiente.regione.emilia-romagna.it/it/acque/approfondimenti/documenti/piano-di-tutela-delle-acque/valutazione-della-sostenibilita-ambientale/sintesi-non-tecnica.

[126] Regione Emilia Romagna (n.d.), Programma di verifica dell’efficacia del Piano di Tutela delle Acque della Regione Emilia Romagna, https://ambiente.regione.emilia-romagna.it/it/acque/approfondimenti/documenti/piano-di-tutela-delle-acque/programma-di-verifica-dellefficacia-del-piano-di-tutela-delle-acque/programma-di-verifica-dellefficacia-del-piano-di-tutela-delle-acque.

[129] Regione Emilia-Romagna (DG cura del territorio e dell’ambiente) (n.d.), Servizi ecosistemici, quanto vale ciò che la natura ci regala?, https://ambiente.regione.emilia-romagna.it/it/notizie/primo-piano/vecchi-primi-piani-plone-4/passaggio-plone-55-pp/servizi-ecosistemici-quanto-vale-cio-che-la-natura-ci-regala (accessed on 25 October 2022).

[133] Regione Lombardia (2022), Scheda informativa - Piani di Governo del Territorio (PGT), https://www.regione.lombardia.it/wps/portal/istituzionale/HP/DettaglioRedazionale/servizi-e-informazioni/Enti-e-Operatori/territorio/pianificazione-comunale-e-provinciale/piani-governo-territorio-pgt/piani-governo-territorio-pgt.

[84] RFI (2022), PFTE - AMBIENTE Relazione Prefattibilità.

[85] RFI (2022), PFTE - Lista di controllo per la valutazione preliminare (art. 6, comma 9, D.Lgs. 152/2006).

[97] RFI (2022), Preassesment del Protocollo ENVISION 326221S01PFBR00RTSXE04A 1 di 72.

[94] RFI (2022), Stazione Di Bari Centrale - Relazione CAM.

[92] RFI (2022), Stazione Di Bari Centrale - Relazione DNSH.

[93] RFI (2022), Stazione Di Bari Centrale - Valutazione del rischio climatico e della vulnerabilità.

[95] RFI (2022), Stazione Di Bari Relazione LEED.

[83] RFI - Direzione Stazioni (2022), PFTE - Relazione Generale.

[111] Ridracoli (n.d.), Diga di Ridracoli, http://www.ridracoli.it/ (accessed on 11 October 2022).

[114] Romagna Acque - Società delle Fonti (2007), Bilancio di Sostenibilità 2007.

[106] Rosso, R. (2017), Bombe d’acqua: alluvioni d’Italia dall’unità al terzo millennio, Marsilio.

[9] Sistema Nazionale per la Protezione Ambientale (SNPA) (n.d.), “Home”, Sistema Nazionale per la protezion dell’ambiente, https://www.snpambiente.it/chi-siamo/ (accessed on  November 2022).

[38] Struttura Tecnica di Missione per l’indirizzo strategico, lo sviluppo delle infrastrutture e l’alta sorveglianza (October 2021), Linee guida operative per la valutazione degli investimenti in opere pubbliche - Settore Ferroviario, Ministero delle infrastrutture e dei trasporti (MIT), https://www.mit.gov.it/nfsmitgov/files/media/notizia/2022-01/2.%20Linee_Guida_Operative_Settore_ferroviario.pdf.

[75] Trinomics, ALTERRA, Arcadis, Risk & Policy Analysis, STELLA Consulting, and Regional Environment Center (2016), Annex 1. Green Infrastrustructure in Italy, European Commission, https://ec.europa.eu/environment/nature/ecosystems/pdf/Green%20Infrastructure/GI_IT.pdf.

[30] UNEP (2014), Integrating Ecosystem Services in Startegic Environmental Assessment: A guide for practicioners, United Nations Environment Programme.

[56] Webuild (n.d.), Digital InfoPoint - Milan Metro Line 4: the metro that brings Milan closer to Europe, https://infopoint.webuildgroup.com/en/sustainable-mobility-en/milan-metro-line-4.html (accessed on  January 2023).

[77] World Bank (2021), Nature-based solutions in China: Financing “sponge cities” for integrated urban flood management, https://blogs.worldbank.org/eastasiapacific/nature-based-solutions-china-financing-sponge-cities-integrated-urban-flood.

[131] World Commission on Dams (2000), Dams and Development: a new framework for decision-making, Earthscan Publications Ltd.

Notes

← 1. The fact-finding Mission took place on 20 and 21 July 2022, in Rome.

← 2. For example, the 1991 Frame Act on protected areas, which provides a detailed regulation on the definition and management of protected areas in Italy; the 1997 Decree for the Protection of Habitats, Flora and Fauna, which transposes the EU Habitats Directive in the national law; and the 2007 Ministry Decree on minimum uniform criteria for the definition of conservation measures specific to Natura 2000 sites.

← 3. Non-urban green areas (beyond agricultural areas) are regulated by specific instruments and agricultural areas with an important naturalistic value (e.g. EUAP, SAC, SPA, etc.) are also subject to specific regulatory restrictions. In addition to that, Local Urban Plans are defined starting from the natural characteristics of the municipal territory, which are assessed and identified through the instrument of the “Use of Soil” Charter.

← 4. Italy aligns with the EU Green Deal and the initiatives coming from it (i.e. the EU Climate Law and Plan, the 2030 Climate Targets, the Fit for 55 package, etc.), it is signature of all major international agreements and conventions on climate and the environment (i.e. Paris Agreement, the UNFCCC, etc.), and, at the national level, it has launched a series of initiatives to strengthen its commitment to sustainable development, such as the creation of a Ministry of Environment and Energy Security (MASE) in 2021 or the allocation of a large part of PNRR funds to green interventions.

← 5. Within MIT, there are different public agencies that deal with NbS/GI specific to transport infrastructure, such as Italian Railway (RFI/FS), the National Highway Authority (ANAS), the National Agency for Flight Assistance (ENAV), National Civil Aviation Authority (ENAC), Port System Authority (AdSP).

← 6. On 21st January 2021, MIT presented the new framework during an online seminar “Opere Pubbliche: programmazione, scelte di policy e criteri di valutazione. Verso la definizione di un modello per lo sviluppo sostenibile” (Ministero delle infrastrutture e dei trasporti (MIT), 21 January 2022[36]).

← 7. An environmental tax is a tax whose tax base is a physical unit (or a proxy of a physical unit) of something that has a proven, specific negative impact on the environment (Eurostat, 2013[135]). It can be defined as a tax levied on activities which are considered to be harmful to the environment and is intended to promote environmentally friendly activities via economic incentives. A notable example is the carbon tax.

← 8. Also, the autonomous provinces of Trento and Bolzano have their own agency for environmental protection – known as APPAs

← 9. For urban planning specifically, the constitutional case law has established that State and regional law can set some limits to certain municipal powers, while always having regard to the general interest for the protection of the territory, and conditionally on neither cancelling out nor compressing municipalities’ powers radically (Formez PA, 2020[132])

← 10. The 14 Metropolitan Cities in Italy are Roma Capitale, Milano, Napoli, Torino, Bari, Palermo, Catania, Bologna, Firenze, Venezia, Genova, Messina, Reggio Calabria and Cagliari. Within the PNRR, the decision was to focus on these cities as they are increasingly exposed to environmental challenges, such as air pollution, climate change impacts and extreme weather events, and the loss of biodiversity. These have serious consequences for the well-being and health of their citizens (I.e. almost 21 million people).

← 11. The 2021-2050 PTE was realised by the Inter-Ministerial Committee for the Ecological Transition (CIPE), coordinated by MASE. This first version of the Plan will be subject to periodic adjustments based on the technological evolution as well as the development of the economic and social policies supporting the Plan’s measures.

← 12. The Legislative Decree 152/2006 entered into force on 31 July 2007. It was subsequently amended and complemented by the Legislative Decree 4/2008 and Legislative Decree 29/2010.

← 13. The consultation process engages the general public and local communities interested in the environmental impacts resulting from the implementation of the plan, as well as public administrations and agencies with environmental competencies and responsibilities.

← 14. Biodiversity, population, human health, fauna, flora, soil, water, air, climatic factors, material assets, cultural heritage including architectural and archaeological heritage, landscape.

← 15. According to the principle of preventive action, the best environmental policy is to prevent rather the negative effects of a project rather than trying to reduce or offset them once they have already taken place.

← 16. In the EU, the EIA has been introduced in 1985 with the Directive 85/337/EEC. This Directive has been modified five times: in 1997, 2003, 2009, 2011, and 2014. The last version dates back to 2014 with the Directive 2014/52/EU.

← 17. Since its entry into force on 29 April 2006, the Code has undergone numerous amendments and additions. Some of the main amendments include the legislative decree 16 June 2017, n. 104, for the transposition of the EU Directive on EIA 2014/52/EU); the Law Decree 34/2020 (converted by Law 77/2020) for the abolition of the VIA Technical Committee; the Las Decree 76/2020 (converted by Law 120/2020) for rationalization of EIA procedures; the Law Decree 77/2021 simplifications (converted with L. 108/2021) for the acceleration of the environmental and landscape process, new EIA regulations and special provisions for PNRR-PNIEC interventions ( (Istituto Superiore per la Protezione e Ricerca Ambientale (ISPRA), n.d.[32]).

← 18. The Technical Committee for the Verification of the Environmental Impact (both for the EIA and SEA) operates within MASE through the Plenary Assembly, the Subcommittees EIA/SEA, and the Technical Groups Instructors and, for procedures which have a shared regional interest, it is also complemented by designated experts for each of the regions and autonomous provinces that are territorially competent.

← 19. Directorate General for Environmental Assessments (DGVA) within MASE.

← 20. The Legislative Decree 32/2019 (also known as Sblocca Cantieri) and the Legislative Decree 72/2020 (also known as Simplification Decree) have accelerated and streamlined the procedures for the environmental assessments of projects.

← 21. Legislative Decree 77/2021 converted into Law 108/2021: “acceleration of the environmental and landscape process, new EIA regulations and special provisions for PNRR-PNIEC interventions”.

← 22. According to the rules set by the European Commission for the disbursement of the funds of the Next Generation EU plan, Member States have to stick to a series of objectives and timeline. Funds are indeed paid by instalments upon completion of targets and milestone by certain tight deadlines.

← 23. The new evaluation framework was launched under the previous Minister Enrico Giovannini, who had changed the name of the ministry into the Ministry of Sustainable Infrastructure and Mobility (MIMS).

← 24. The SNSvS defines the national reference framework for environmental and territorial planning, programming and assessment processes to implement the sustainable development goals of the 2030 Agenda. The most recent version of the Strategy has been approved by CIPE with Resolution No. 108 back in 2017, but it is supposed to be updated every three years. The National Reform Programme (NRP) and the Document on Economics and Finance (DEF) are key documents for the implementation of the Strategy. Moreover, the proposed actions and the operational instruments must also be compatible with the binding objectives at the Community level.

The National Sustainable Development Strategy 2017-2030 is the main tool for the creation of a new circular economic model, low CO2 emissions, resilient to climate change and other global changes due to local crises, such as loss of biodiversity, modification of fundamental biogeochemical cycles (carbon, nitrogen, phosphorus) and changes in land use (Agenzia per la coesione territoriale, n.d.[134]).

← 25. To date, operational guidelines have been issued just for public investments in railway (in December 2021), road transport (in July 2022), and fast public transportation (September 2022, currently undergoing public consultation), but the Ministry is committed to extend them to the other sectors, starting with mass transport.

← 26. These new guidelines were issued by the Higher Council for Public Works specifically for infrastructure projects financed with PNRR funds, but they can be applied, more generally, to any large-scale infrastructure projects.

← 27. The estimates must be validated by a third-party certifier according to internationally recognized protocols and standards.

← 28. The PFTE outlines the (i) geometric-spatial structure of the project, (ii) the foundation, structural and functional types of the work (without explicit calculations), (iii) the work’s interference with the sub-services and with the archaeological cultural heritage, (iv) mitigation and compensation measures to reduce the environmental impact and the impacts on the archaeological setting, (v) an expenditure forecast based on the award procedure.

← 29. GPP refers to a set of practices aimed at introducing environmental considerations in the procurement process, while GI and NbS are mainly products, goods, and services to be procured.

← 30. The new Code of Public Contracts (abrogating the 2006 Code) was issued with the Legislative Decree of 18 April 2016, n. 50, and transposed the EU 2014 Directives on Public Procurement. The 2016 Code has been further modified with the Legislative Decree of 19 April 2017, n. 56, which entered into force on 20 May 2017.

← 31. The other countries are Norway, Czech Republic, and Cyprus*.

*Note by the Republic of Türkiye

The information in this document with reference to “Cyprus” relates to the southern part of the Island. There is no single authority representing both Turkish and Greek Cypriot people on the Island. Türkiye recognises the Turkish Republic of Northern Cyprus (TRNC). Until a lasting and equitable solution is found within the context of the United Nations, Türkiye shall preserve its position concerning the “Cyprus issue”.

Note by all the European Union Member States of the OECD and the European Union

The Republic of Cyprus is recognised by all members of the United Nations with the exception of Türkiye. The information in this document relates to the area under the effective control of the Government of the Republic of Cyprus.

← 32. Decree of 10 April 2013

← 33. Federparchi and Assosistema, the Department of economic and social sciences of the University of Padua, and firms like Eurosintex, Novamont, and Adlaw Administrative lawyers.

← 34. According to the Ministerial Decree of 21 September 2016, the GPP Management Committee is composed by representatives of the three relevant Ministries (Ministry of Environment and Energy Security, Ministry of Economic Development, and Ministry of Economy and Finance), ISPRA, CONSIP, ENEA, some experts from ARPA, and two representatives of the Regions.

← 35. See https://ec.europa.eu/regional_policy/en/atlas/programmes/2014-2020/italy/2014it16m2op004

← 36. Jaspers (2021) - Independent quality review “Asse Ferroviario Palermo-Catania-Messina. Raddoppio della tratta Bicocca-Catenanuova”.

← 37. Ibid

← 38. Jaspers (2021). Independent quality review “Asse Ferroviario Palermo-Catania-Messina. Raddoppio della tratta Bicocca-Catenanuova”

← 39. Ibid

← 40. In both examples, national averages are calculated over the totality of Italy’s metropolitan cities and/or regional or province administrative centres. In the latter example, the figure refers to “urban parks of significant public interest”.

← 41. Nodo Verde was identified as one of the 8 pilot projects (i.e. “progetti pilota ad alto rendimento”) under PINQuA.

← 42. In particular, PINQuA is set to receive a total of EUR 2.8 billion, including EUR 477 million in national resources, as set out in Italy’s 2021 Budget Law and in a number of other regulatory provisions (Ministero delle infrastrutture e dei trasporti (MIT), 2022[98]).

← 43. This analysis was mandatory for all projects receiving over EUR 10 million in PNRR funding.

← 44. In Italy, the term diga (i.e. dam) refers to a structure built at the bottom of a valley, in a section generally characterised by a small width (narrow or gorge) and extending transversally across its entire width, with the function of retaining all or part of the outflow of a watercourse, from which an artificial lake or reservoir thus originates (CISL FP, 2008[103]).

← 45. In particular, the Ministry manages safety control of big dams and strategic water infrastructures including (i) the approval of projects; (ii) surveillance of the construction phase; (iii) oversight of the management and decommissioning activities; (iv) the review and approval of studies about hydro-geological requalification; and (v) the preparation of practical documents and guidelines.

← 46. Since 2006, the Italian Registry of Dams (Registro Italiano Dighe) – the main body in charge of dam management and oversight at the national level – was dismantled, and its competences were transferred to the Ministry of Infrastructure and Transport.

← 47. Between 1988 and 2007, coastal subsidence has significantly decreased, moving from an average of 3 cm/year to 2 cm/year (Romagna Acque - Società delle Fonti, 2007[114]).

← 48. Chemical conditions are assessed by monitoring the concentration levels of chemical pollutants in water. Ecological conditions are assessed by monitoring water ecosystem functionality. For water courses, any hydro-morphological alterations – ad their potential impacts on water ecosystems – are also assessed (ARPAE Emilia Romagna, 2016[113]) (ARPAE Emilia Romagna, 2021[123]).

← 49. The report contains comprehensive recommendations on dam building and provides a framework for addressing the negative environmental impacts of dams (World Commission on Dams, 2000[131]).

Metadata, Legal and Rights

This document, as well as any data and map included herein, are without prejudice to the status of or sovereignty over any territory, to the delimitation of international frontiers and boundaries and to the name of any territory, city or area. Extracts from publications may be subject to additional disclaimers, which are set out in the complete version of the publication, available at the link provided.

© OECD 2023

The use of this work, whether digital or print, is governed by the Terms and Conditions to be found at https://www.oecd.org/termsandconditions.